Find the next project before your competition does.

See pricing

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 19, 2026 at 7:00 PM

Updated November 23, 2026

Site work and new construction of a mixed-use development in Schnecksville, Pennsylvania. Completed plans call for the construction of a educational facility; and for site work for a educational facility.

Questions Due Date: Dec 2nd 2026, 4:00 PM EST The scope of work for this project includes the provision of all labor, materials, tools, supervision and permits, to renovate an portion of the first floor of Science Hall. The scope of work for this project includes, but is not limited to, renovating the existing first floor of Science Hall to create a new, state-of-the-art Biotechnology Laboratory and Training Facility. The project includes renovation of existing laboratories, classrooms, storage areas, and offices to accommodate two biotechnology teaching laboratories, laboratory support and storage spaces, a biotechnology lecture hall, aseptic fill and automated fill training rooms, office space, and associated support areas. Work includes demolition, new partitions, ceiling / light fixtures, casework, flooring and other finishes. HVAC, plumbing, and electrical work are included in the renovation. Exterior work includes refurbishment of the existing patio area. Alternate Bid Item: Removal and replacement of existing windows in area of work. Construction will be bid for the following Prime Contracts: Contract No. 1 - General Construction Contract Either a Certified Check or a Bid Bond (with a corporate surety authorized to do business in Pennsylvania) drawn to the order of Lehigh Carbon Community College in the amount equal to ten percent (10%) of the amount of the bid must be submitted with each bid as security. A Performance Bond in the amount of 100% of the contract shall be furnished by the successful bidder as detailed in the Instructions to Bidders. The Project Architect is MKSD Architects, LLC, 1209 Hausman Road, Suite A, Allentown, PA 18104. Except as otherwise provided by law, no bidder may withdraw his bid within ninety (90) consecutive calendar days after the actual date of opening thereof, or one hundred twenty (120) consecutive calendar days if the award is delayed by a required approval of another governmental agency, the sale of bonds or the award of a grant or grants. The Board of Trustees will accept the bid of the lowest responsible bidder when the kinds and quality of supplies and equipment offered are the same or are equal, but they reserve the right to accept or reject any of all bids, to cure any non-material oversight, to withhold award for a period of sixty (60) days, and to award the bid in the best interest of Lehigh Carbon Community College as judged by the Board of Trustees.

GC Bidding

$3,700,000.00

Public - State/Provincial

Our team is requesting plans for this project.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
788
Active Projects
347
Bidding Soon
4,446
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 11, 2026

February 11, 2027

Project location map

4525 Education Park Dr, Schnecksville, PA

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed