Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 6, 2026 at 7:00 PM

Updated November 9, 2026

Site work and new construction of a mixed-use development in Mauldin, South Carolina. Completed plans call for the construction of a sidewalk / parking lot; bridge / tunnel; for site work for a bridge / tunnel; and sidewalk / parking lot.

Installation of sidewalks along Miller Road. Work includes site excavation, drainage, catch basins, sidewalk construction, and a pedestrian bridge. Construction Cost Range: $ 1.7M - $2.5M *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

GC Bidding

$2,500,000.00

Public - County

Our team is requesting plans for this project.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
233
Active Projects
119
Bidding Soon
1,380
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 3, 2026

January 17, 2027

Project location map

Miller Rd, Mauldin, SC

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed