BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 24, 2025 at 8:00 PM

Updated September 25, 2025

Site work and paving for a mixed-use development in Brewer, Maine. Working plans call for site work for a playground / park / athletic field; for paving for a playground / park / athletic field; sidewalk / parking lot; and sidewalk / parking lot.

As of September 24, 2025, this project is in final planning. The general contractor has been identified. Construction is expected to begin in October of 2025. As part of a larger Amphitheater project in Indian Trail Park, phase 1 includes to construction of the seating area and paved walkway. Work consists of procuring granite blocks for seating, installing them and creating a crusher dust walkway. In addition, a paved walkway will be constructed to lead to the future stage area. Electrical conduit will also be installed for future use from an existing pole to the planned stage area. This project will occur in the existing park and will potentially require coordination with other events on evenings and weekends.

Pre-Construction/Negotiated

Playgrounds / Parks / Athletic Fields

$422,680.00

Public - City

Paving, Site Work

4

5

4

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
62
Active Projects
22
Bidding Soon
301
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 22, 2024

October 15, 2025

Project location map

To Be Determined, Brewer, ME

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.