Published February 26, 2025 at 7:00 PM
Updated July 3, 2025
Site work for a water / sewer project in Brewer, Maine. Completed plans call for site work for a water / sewer project.
The City of Brewer, Maine is requesting Bids for the construction of the following Project: WWTP Miscellaneous Infrastructure Improvements The Project includes the following Work: Work under this project includes, but is not limited to, multiple and miscellaneous improvements at the Brewer Wastewater Treatment Plant including Base Bid - existing grit screw conveyor drive modifications for Aerated Grit Chamber No. 2, replacement of the existing primary sludge pumps, replacement of existing drain and vent piping in the Operations Building Sludge Thickening Room, replacement of existing drain piping, vent piping and floor drains in the Chlorination Building; new dissolved oxygen probe systems and blower PLC control modifications, minor pipe sealing and concrete wall crack repair, asbestos removal, minor concrete work, metals fabrication, railings and grating, electrical, SCADA system modifications, incidentals and all work required for construction of a complete project and as part of the Base Bid. Alternate Bid No. 1 includes replacement of the existing lower mechanism for Sludge Thickener No. 1. Alternate Bid No. 2 includes replacement of existing fire doors throughout the Operations Building. Alternate Bid No. 3 includes installation of the new aeration basin process water spray system. Alternate Bid No. 4 includes demolition of the existing clarifier mechanisms for Final Clarifiers No. 1 & No. 2 and installation of new access platforms. Alternate Bid No. 5 includes replacement of an existing process water duplex strainer and process water pump concrete supports. Alternate Bid No. 6 includes debris removal from process tanks. Bids are requested for the following Contract: WWTP Miscellaneous Infrastructure Improvements Project has an expected duration of 210 days. Obtaining the Bidding Documents The Issuing Office for the Bidding Documents is: Olver Associates Inc. 290 South Main Street P. O. Box 679, Winterport, Maine 04496 Question Deadline 02/05/2025 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer to writing.
Bid Results
Water / Sewer
$352,040.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 14, 2025
April 8, 2025
To Be Determined, Brewer, ME
Related To This Project
Brewer, ME
Bid Date: Mar 06 2025
Brewer, ME
Bid Date: May 07 2025
Brewer, ME
Bid Date: May 26 2025
Brewer, ME
Bid Date: Jul 14 2025
Brewer, ME
Bid Date: Jul 18 2025
Brewer, ME
Bid Date: Aug 19 2025
Brewer, ME
Bid Date: Aug 07 2025
Brewer, ME
Bid Date: Sep 26 2024
Brewer, ME
Bid Date: Sep 04 2024
Brewer, ME
--
Brewer, ME
--
Brewer, ME
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.