BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 26, 2025 at 7:00 PM

Updated July 3, 2025

Site work for a water / sewer project in Brewer, Maine. Completed plans call for site work for a water / sewer project.

The City of Brewer, Maine is requesting Bids for the construction of the following Project: WWTP Miscellaneous Infrastructure Improvements The Project includes the following Work: Work under this project includes, but is not limited to, multiple and miscellaneous improvements at the Brewer Wastewater Treatment Plant including Base Bid - existing grit screw conveyor drive modifications for Aerated Grit Chamber No. 2, replacement of the existing primary sludge pumps, replacement of existing drain and vent piping in the Operations Building Sludge Thickening Room, replacement of existing drain piping, vent piping and floor drains in the Chlorination Building; new dissolved oxygen probe systems and blower PLC control modifications, minor pipe sealing and concrete wall crack repair, asbestos removal, minor concrete work, metals fabrication, railings and grating, electrical, SCADA system modifications, incidentals and all work required for construction of a complete project and as part of the Base Bid. Alternate Bid No. 1 includes replacement of the existing lower mechanism for Sludge Thickener No. 1. Alternate Bid No. 2 includes replacement of existing fire doors throughout the Operations Building. Alternate Bid No. 3 includes installation of the new aeration basin process water spray system. Alternate Bid No. 4 includes demolition of the existing clarifier mechanisms for Final Clarifiers No. 1 & No. 2 and installation of new access platforms. Alternate Bid No. 5 includes replacement of an existing process water duplex strainer and process water pump concrete supports. Alternate Bid No. 6 includes debris removal from process tanks. Bids are requested for the following Contract: WWTP Miscellaneous Infrastructure Improvements Project has an expected duration of 210 days. Obtaining the Bidding Documents The Issuing Office for the Bidding Documents is: Olver Associates Inc. 290 South Main Street P. O. Box 679, Winterport, Maine 04496 Question Deadline 02/05/2025 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer to writing.

Bid Results

Water / Sewer

$352,040.00

Public - City

Site Work

62

25

4

5

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
63
Active Projects
16
Bidding Soon
307
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 14, 2025

April 8, 2025

Project location map

To Be Determined, Brewer, ME

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.