Site work and paving for a mixed-use development in Falmouth, Maine. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
Middle Road (Route 9)/Falmouth Road/Bucknam Road Intersection (Falmouth Corners) :The work at this intersection includes signal head modifications, pavement milling, pavement installation and lane assignment/marking changes. Installation of one catch basin and connecting it to an existing drainage structure. Installation of concrete slipform curb and sidewalk that will continue down Bucknam Road. Perform all other incidental as described in the specifications. Bucknam Road Sidewalk :The work at this intersection includes installing approximately 1,110 linear feet of 6' wide HMA sidewalk, ADA compliant ramps per the attached plans. The improvements include, but are not limited to, installing aggregate base gravel, concrete curb (Mold 2), HMA pavement, detectable warning fields, road painting, installation of drainage structures and storm drain, riprap aprons and resetting signs/mailboxes, per the project plans that are included with this RFP. Perform all other incidental as described in the specifications. The Town of Falmouth Public Works Department seeks qualified contractors to satisfactorily complete intersection improvements to the Falmouth Road/Middle Road/Bucknam Road intersection (aka Falmouth Corners) and complete a new sidewalk installation on Bucknam Road from Falmouth Corners to the I-295 bridge. There will not be a pre-bid meeting for this project. Prospective bidders are encouraged to visit the site and may request a site meeting with the Town Engineer to review the project. All pre-bid correspondence shall be submitted electronically to Justin Early, Town Engineer, at jearly@falmouthme.org. All excavation, restoration, construction, materials and maintenance of traffic control shall adhere to Maine Department of Transportation and Town of Falmouth specifications. If there are conflicting requirements, the stricter shall apply. The Contractor shall be responsible for traffic control and signage during the performance of work and shall adhere to the Manual of Uniform Traffic Control Devices and/or Town ordinances regulating traffic control. If there are conflicting requirements, the stricter shall apply. Contractor shall maintain alternating 1-way traffic, at a minimum, unless otherwise approved in advance. Contractor shall provide the Town of Falmouth with a construction schedule containing the construction sequence and the estimated time required to complete the project. The work must be completed by June 30th, 2026. Contractor shall be responsible for contacting Dig Safe and non-Dig Safe utility operators as required by law. All improvements included in the project shall have a one-year warranty. The contractor will not be required to hold any retainage funds. Awarded bidder shall enter into agreement (attached) and provide the required insurance certificate per the agreement. A bid bond and payment/performance bond are not required for this project. An excavation permit will be required for this project. The fee will be waived Anything not otherwise specified, that is necessary to complete the project as specified, shall be considered incidental. Refer to the project description and enclosed technical specification for project specifics The Town of Falmouth reserves the right to accept or reject any and all bids. Question Deadline 08/26/2025 at 11:00 AM ET Questions regarding this bid/proposal shall be accepted.
Award
Sidewalks / Parking Lot
$496,209.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 28, 2025
September 29, 2025
Bucknam Rd, Falmouth, ME
Related To This Project
Falmouth, ME
Bid Date: Sep 16 2025
Falmouth, ME
Bid Date: Oct 30 2025
Falmouth, ME
Bid Date: Oct 31 2025
Falmouth, ME
Bid Date: Nov 19 2025
Falmouth, ME
Bid Date: Aug 21 2025
Falmouth, ME
--
Falmouth, ME
Bid Date: May 14 2025
Falmouth, ME
Bid Date: Nov 14 2025
Falmouth, ME
--
Falmouth, ME
Bid Date: Mar 11 2025
Falmouth, ME
Bid Date: Mar 13 2025
Falmouth, ME
--
Falmouth, ME
Bid Date: Dec 18 2024
Falmouth, ME
Bid Date: Nov 20 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.