Site work for a bridge / tunnel in Lewiston, Maine. Completed plans call for site work for a bridge / tunnel.

Question Deadline 03/14/2024 Questions and Requests for Information shall be submitted to Peralie Burbank at pburbank@lewistonmaine.gov Remove existing pavement and replace the existing 12.8' (rise) x 12' (span) corrugated metal pipe with a single 9'-11" (rise) x 31'-4" (span) aluminum box culvert and concrete footings in accordance with the US Army Corps (ACOE) Stream Crossing Programmatic Notification Form (NAE-2021-02812-MOD). Provide bypassing, dewatering, and erosion control measures during construct Remove existing pavement and replace the existing 12.8' (rise) x 12' (span) corrugated metal pipe with a single 9'-11" (rise) x 31'-4" (span) aluminum box culvert and concrete footings in accordance with the US Army Corps (ACOE) Stream Crossing Programmatic Notification Form (NAE-2021-02812-MOD). Provide bypassing, dewatering, and erosion control measures during construct. The City reserves the right to negotiate with the low bidder to bring projects down to within budget. The Finance Committee reserves the right to accept any Proposal or reject any or all Proposals if it is deemed to be in the public interest to do so. The City of Lewiston reserves the right to add or delete portions of the work required under this Contract, using unit prices established in the Proposal. The Contractor's attention is directed to Sections 20.29, "Extra Work" and 20.30 "Reduction of Work" of the Specifications. If no unit price exists, a change order must be negotiated between the City of Lewiston and the Contractor. No Proposal will be considered unless it is accompanied by a bid security in the form of a bid bond or certified check in the amount of five percent (5%) of the total bid price, made out in favour of the City of Lewiston. All bid securities will be released upon deliverance of a signed Contract or, if no Contract award is made, within forty-five (45) days after the opening of the Proposals, unless forfeited as herein stipulated. A Performance Bond and a Labour and Material Payment Bond, preferably executed on AIA Bond Form Number A311, in an amount equal to the total Contract price, of a surety company satisfactory to the Purchasing Agent, will be required of the successful bidder to ensure completion of the work and the proper fulfillment of the conditions of the Contract. The total Contract price shall mean the total bid price as stated in the Proposal based on the estimated quantities of the various items of work.

Award

Bridges / Tunnels

$667,991.00

Public - City

Site Work

16

14

4

5

Subscribe For Documents

35 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
102
Active Projects
29
Bidding Soon
729
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.