Site work for a water / sewer project in Mapleton, Maine. Completed plans call for site work for a water / sewer project.

**As of September 25, 2025, this project has not yet been awarded. A timeline for award has not yet been established.** Work under this project includes, but is not limited to, replacing the existing pumping and grinder equipment at the Village Pump Station and making modifications to the generator ductwork and pump station building walls to accommodate the ductwork modifications and incidentals as required for construction of a complete project. The project must be substantially completed within 90 consecutive calendar days and complete within 120 calendar days after the execution of Notice to Proceed. The date upon which the Notice to Proceed is activated can be moved to accommodate the Contractor's work schedule. A bid must be accompanied by Bid security made payable to Owner in an amount of 5% of Bidder's maximum bid price and in the form of a certified check or Bid Bond issued by surety meeting the requirements of the General Conditions. Agency Not a Party This contract is expected to be funded in whole or in part by the State of Maine Department of Environmental Protection (DEP) Clean Water State Revolving Loan Fund (CWSRF) program. Neither the State of Maine nor any of its departments, agencies, or employees is or will be a party to this contract. The Contractor must comply with all Federal Requirements per the CWSRF Supplementary Conditions. Should a Bidder find discrepancies in, or omissions from, the Contract Documents, or if he/she is in doubt as to their meaning, the Bidder shall at once notify the Owner in writing. No answer to an oral question will be given prior to the award ofthe Contract. Any information given to Bidders by means other than set forth below in the Contract Documents shall be unauthorized and shall not be used as the basis of a claim against the Owner or the Engineer.

Award

Water / Sewer

$318,500.00

Public - City

Site Work

11

17

2

3

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
29
Active Projects
9
Bidding Soon
161
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 12, 2025

October 13, 2025

Project location map

103 Pulcifur Rd, Mapleton, ME

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.