BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 1, 2025 at 8:00 PM

Updated October 2, 2025

Site work, paving and renovation of a bridge / tunnel in Newry, Maine. Completed plans call for the renovation of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

The Government intends to award a single firm-fixed-price contract for the WMF Gilead Trail Bridge Superstructure Replacement on the White Mountain National Forest. Acquisition and source selection will follow FAR Parts 13 and 36. A site visit is scheduled for September 15, 2025, at 10:00 AM Eastern. Interested vendors should meet at the parking lot on Route 2, just past the Bog Brook Training Site when coming from the east (Lat 44.400077, Long -70.928575). Offerors or quoters are urged and expected to inspect the site where the work will be performed. PDF type 36C77625Q0277 Location: White Mountain National Forest, near Bog Brook Training Site, Route 2, Gilead, ME 04217. MAGNITUDE OF CONSTRUCTION PROJECT Between $250,000 and $500,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Bridge is located at mile point 8.0094 on the Gilead Snomo Trail (95459) crossing over Bog Brook. Bridge coordinates are 44.396002, -70.924182. NFS Road 741 (Philbrook Rd) accesses the bridge 0.5 miles in from RT2. NFSR 741 a Native Material Gated Forest Service Road is approximately 8 miles from Bethel Maine, and 21.9 miles from Gorham, NH The Contractor shall conduct work within the work periods shown below, and in accordance with applicable permits or regulations. Activities not otherwise restricted may be scheduled at contractor's preference, when consistent with material limitations, manufacturer's instructions, and in accordance with approved work schedule and suitable advance notification as required. Work shall be conducted safely, performed diligently, in a workmanlike manner adhering to Plans and Specifications and instructions, and be completed promptly. Contractor shall not suspend work prior to implementing appropriate soil stabilization and site protection measures, without approval of COR. No pre-bid tour is scheduled at this time.

Award

Bridges / Tunnels

$291,450.00

Public - Federal

Paving, Renovation, Site Work

8

13

6

5

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
86
Active Projects
28
Bidding Soon
612
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 26, 2025

October 1, 2025

Project location map

Multiple Locations, Newry, ME

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.