BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 14, 2026 at 8:00 PM

Updated September 17, 2026

Site work and renovation of a municipal facility in Northport, Maine. Completed plans call for the renovation of a municipal facility.

Renovation and site work for temporary Town Office space. Parking Stalls: Remove existing asphalt Remove plantings and grass as needed for new construction. Grading as necessary to achieve accessibility compliance at ADA stall , access aisle, and path to upper entry deck. Striping Accessible parking stall sign on post Gravel compaction at ADA stall , access aisle, and path to new porch at entry. Install parking stalls as shown on sketch. Walkways - Remove plantings and grass as needed for new construction. Compacted gravel surface between accessible parking and entry deck Compacted gravel pathway surface between entry decks 3'-0" walkway in front of parking stalls Decks at Accessible Entry Doors: Wood framed. Pressure treated decking Exterior Doors: (1) New exterior Entry/Exit Door (Upper Entry): Insulated fiberglass door (style as shown in elevations). Smooth finish with simulated divided lights. Install lever hardware (interconnected deadbolt type) and closer. Lower Entry: Remove sill to achieve accessible threshold (1/2" max height) and replace hardware with lever (interconnected deadbolt type) and closer. If sill can't be removed, replace door with same specs as item above. Doors: Remove sill from interior meeting room door Install lever hardware at meeting room doors ( interior and exterior) Frame and install new door between Finance and Storage (per plan) Walls / Ceiling / Floor Finish: 5/8" Type 'X' GWB for Meeting Room Painting: Owner to complete all priming and painting of walls, ceilings, and floors (where needed). Unless noted otherwise, existing interior finishes are intended to remain. Alternate: Alternate #1: Toilet Room Provide separate cost for Toilet Room to be placed in "Storage" room (adjacent to Code Office) . Refer to sketch. Scope includes: Enlarge door opening to 3'-0"x6'-8" New door and hardware ADA Lavatory ADA Toilet Grab Bars (36", 42", and 18") Accessories: Toilet Paper Holder, Mirror

GC Bidding

$470,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
99
Active Projects
23
Bidding Soon
457
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 9, 2026

November 23, 2026

Project location map

8 Beech Hill Rd, Northport, ME


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.