Site work and paving for a sidewalk / parking lot in Westbrook, Maine. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Project consists of the renovation and paving of approximately 7,488 SYof Organizational andNonOrganizational parking at the Westbrook Armory located at 120 Stroudwater Street, Westbrook,Maine. This includes approximately 847 SYof 8" thick concrete pavement with an Alternate Bid Item expanding the 8" concrete pavement to a total of 3,099 SY. Project requirements also include the removal of approximately 7660 CYof existing gravel parking; emplacement of 223 SYof concrete pads and aprons, 226 LF ofconcrete curb; the demolition of the abandoned metal storage building (1,800 sf) and slab, the replacement ofexistingfencing and gates, installation of stomwater drainage and exterior lighting. Project will be executed in two phases with the earthwork phase completed no later than 1 October 2024 and the paving phase no later than 31 July 2025. All work to be executed in accordance with plans and specifications developed by Colby CompanyEngineering, dated 24 May 2024. The Department of Defense, Veterans and Emergency Management is conducting a competitive bid process for the Westbrook Armory MOV/POV Compound Project in Westbrook, Maine. Project consists of the renovation and paving of approximately 7,488 SY of Organizational and Non-Organizational parking at the Westbrook Armory located at 120 Stroud water Street, Westbrook, Maine. This includes approximately 847 SY of 8" thick concrete pavement with an Alternate Bid Item expanding the 8" concrete pavement to a total of 3,099 SY. Project requirements also include the removal of approximately 7,660 CY of existing gravel parking; emplacement of 223 SY of concrete pads and aprons, 226 LF of concrete curb; the demolition of the abandoned metal storage building (1,800 sf) and slab, the replacement of existing fencing and gates, installation of storm water drainage and exterior lighting. Project will be executed in two phases with the earthwork phase completed no later than 1 October 2024 and the paving phase no later than 31 July 2025.

Award

Sidewalks / Parking Lot

$809,311.00

Public - Federal

Paving, Site Work

19

17

12

7

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
157
Active Projects
46
Bidding Soon
1,123
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 13, 2024

July 15, 2024

Project location map

120 Stroudwater St, Westbrook, ME

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.