Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work, paving and new construction of a civil project in Renton, Washington. Completed plans call for the construction of a bridge / tunnel; for site work for a road / highway; for paving for a road / highway; bridge / tunnel; and bridge / tunnel.
As of June 2020, this project is in the final design work. Heavy construction is expected to begin at the end of June/beginning of July. Site prep and early construction has already begun and is ongoing. Geotechnical borings, high-visibility fencing installation and clearing and grubbing are approved activities under Phase 1 guidelines. An awarded general contractor joint venture team has been identified. The Renton to Bellevue project will add new capacity to create a two-lane express toll lane system between SR 167 in Renton and Northeast 6th Street in Bellevue. This project will connect a 40-mile system of express toll lanes that improves speeds and trip reliability for all travelers and supports the new I-405 Bus Rapid Transit system included in the Sound Transit 3 package. For additional information on this project, please direct your inquiries to the Engineering Manager: Phil Fordyce Phone: (425) 456-8590 Email:fordyce@wsdot.wa.gov Non-motorized trail First item of work, completion by December 2020 Realign and reconstruct the existing Lake Washington Trail (MP 7.7 - MP 10.2) west of its current location to reside within the Eastside RailCorridor from Ripley Lane in Renton to Coal Creek Parkway in Bellevue. Build a new Eastside Rail Corridor regional trail bridge over southbound I-405 at Wilburton. Express toll lanes Widen I-405 from north of SR 167 to just south of NE 6th Street (MP 2.5-13.7) to accommodate an additional lane both northbound and southbound. The additional lane will be paired with the existing northbound and southbound HOV lane to create two Express Toll Lanes (ETLs). Auxiliary lanes Construct a southbound I-405 auxiliary lane between NE 44th Street on-ramp and NE 30th Street off-ramp. Extend one of the southbound I-405 auxiliary lanes that currently starts at the I-90 on-ramp to end farther south at the 112th Avenue SE off-ramp. Bridges and structures Reconstruct local road overpasses at Cedar Avenue, Renton Avenue and Main Street to accommodate added I-405 lanes. Widen I-405 bridge structures over the Cedar River, NE Park Drive, Sunset Boulevard and SE 8th Street. Build a new northbound I-405 bridge structure over the Eastside Rail Corridor adjacent to the existing I-405 structure. Major interchange work Replace the 112th Avenue SE Interchange bridge structure over I-405. NE 44th Street Interchange: Replace the northbound and southbound I-405 bridge structures over May Creek. Replace the NE 44th Street bridge structure over I-405 and reconstruct the interchange. Construct new direct access ramps in the I-405 median. Realign and reconstruct Lake Washington Boulevard between NE 44th Street and SE 76th Street, and realign the northbound on-ramp to I-405 to connect to Lake Washington Boulevard. Local intersections will be roundabout controlled. Ramp reconfigurations Reconfigure the southbound I-405 to eastbound I-90 ramp from one lane to two lanes. Realign the northbound I-405 to eastbound I-90 ramp. Widen the existing northbound I-405 to SR 520 ramp from two lanes to three lanes. Environmental and other enhancements Construct two fish passage crossings under NE 44th Street and under I-405 for UNT 08.LW.0283 (formerly referred to as Gypsy Creek). Construct a fish passage crossing under I-405 for Stream 7.7A. Construct a fish passage crossing under I-405 for Stream 7.8. Construct new noise walls and relocate two existing noise walls. Construct stormwater management and water quality facilities. Other improvements will include pavement markings, permanent signing, illumination, intelligent transportation systems, barriers, and tolling gantries. Potential added scope Construct direct access ramps at 112th Avenue SE WSDOT - I-405/Renton to Bellevue - Corridor Widening and ETL
Award
Bridges / Tunnels
$704,975,000.00
Public - State/Provincial
New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 1, 2019
June 29, 2020
I-405, Renton, WA
Related To This Project
Renton, WA
Bid Date: May 04 2021
Renton, WA
Bid Date: Apr 13 2021
Renton, WA
Bid Date: Mar 24 2021
Renton, WA
Bid Date: Feb 16 2021
Renton, WA
Bid Date: Mar 02 2022
Renton, WA
--
Renton, WA
Bid Date: Feb 22 2022
Renton, WA
Bid Date: Mar 01 2022
Renton, WA
Bid Date: Feb 08 2022
Renton, WA
Bid Date: Jan 11 2022
Renton, WA
Bid Date: Feb 10 2022
Renton, WA
--
Renton, WA
Bid Date: Jan 12 2022
Renton, WA
--
Renton, WA
Bid Date: Dec 16 2021
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.