Published April 11, 2025 at 8:00 PM
Updated April 12, 2025
Site work for a water / sewer project in Jupiter, Florida. Conceptual plans call for site work for a water / sewer project.
Update: Many of the existing watermains in the Loxahatchee River Road area were constructed in 1977 using asbestos cement (AC) pipe of substandard size for today's fire protection requirements. The AC pipe has surpassed its 40 year useful life and failures occur frequently. The watermain should be replaced to improve system reliability and fire protection. Under this project AC watermains, valves and hydrants will be replaced on Williamson Road, Sullivan Road, and Shirley Drive. Existing watermains on Old Fort Jupiter (OFJ) Road and Old Orange Road will be extended to provide a looped system, eliminating dead-ends and improving water quality. This project supports the Town's Strategic Plan Results of Fiscal Responsibility and Safety by managing the renewal and replacement of water system assets to provide well maintained neighborhood infrastructure. These activities enable the Utility to provide established levels of service for safe and reliable drinking water plus necessary fire protection. Phase I completed in 2019, included replacing watermains on Keith and Urdea Roads. In 2020, the Loxahatchee River Road aerial culvert crossing was replaced with a subaqueous crossing concurrently with bridge improvements by PBC. The scope for Phase 2 improvements was expanded to include OFJ Road and Old Orange Road, which were originally programmed for FY29 but were moved up to recognize economies of scale due to proximity of work areas with this project. Project is included Town of Jupiter Fiscal Year 2025-2029 ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- Many of the existing watermains in the Loxahatchee River Road area were constructed in 1977 using asbestos cement (AC) pipe of substandard size for today's fire protection requirements. The AC pipe has surpassed its 40 year useful life and should be replaced to improve system reliability and fire protection. Under this project phase AC watermains, valves and hydrants will be replaced on Williamson Road, Sullivan Road, Shirley Drive, and the existing watermain on Old Fort Jupiter Road will be extended west to tie into the existing watermain on Loxahatchee River Road to eliminate an existing watermain deadend. As of April 17, 2028, this project is included in the Town of Jupiter's Fiscal Year 2024-2028 CIP and funding is allotted for construction in FY 2027. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Water / Sewer
$1,367,700.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 1, 2028
Multiple Locations, Jupiter, FL
Related To This Project
Jupiter, FL
Bid Date: Jun 03 2025
Jupiter, FL
Bid Date: May 20 2025
Jupiter, FL
Bid Date: Oct 13 2022
Jupiter, FL
Bid Date: Nov 17 2022
Jupiter, FL
Bid Date: May 31 2019
Jupiter, FL
Bid Date: Nov 07 2024
Jupiter, FL
Bid Date: Oct 18 2022
Jupiter, FL
Bid Date: Oct 18 2022
Tallahassee, FL
Bid Date: Oct 27 2022
Vero Beach, FL
Bid Date: Nov 16 2022
Delray Beach, FL
Bid Date: Nov 03 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.