Site work for a water / sewer project in Jupiter, Florida. Conceptual plans call for site work for a water / sewer project.

Update: Existing watermains at the end of Eganfuskee Street, Waldemar Road, Body Court, Carl Street, and Clark Lane consist of asbestos cement (AC) pipe constructed in 1971 that is undersized for current fire protection levels of service. Under this project, undersized AC watermains will be replaced with properly sized PVC or ductile iron pipe. Valves, hydrants, and water services from the main to the meter will also be replaced for improved system isolation and fire protection. This project supports the Town's Strategic Plan Results of Fiscal Responsibility and Safety by managing the renewal and replacement of water system assets to provide well maintained infrastructure at established levels of service. These activities enable the Utility to provide safe and reliable drinking water plus necessary fire protection, that meets all regulatory requirements. In 2019, watermains were replaced on Elsa Road, Paulina Road, and a portion of Yacht Club Drive with construction of drainage improvements on Elsa and Paulina Roads. This project represents a continuation of the prior improvements. Staff report frequent line breaks on Waldemar Rd and Body Court especially after heavy rainfall events necessitating extensive restoration to the roadway and private property. The project budget has been increased by $83,155 in accordance with current construction market pricing. Project is included Town of Jupiter Fiscal Year 2025-2029 ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- Existing watermains at the end of Eganfuskee Street, Waldemar Road, Body Court, Carl Street, and Clark Lane consist of asbestos cement (AC) pipe constructed in 1971 that is undersized for current fire protection levels of service. Under this project, undersized AC watermains will be replaced with properly sized PVC or ductile iron pipe. Valves and hydrants will also be replaced and installed for improved system isolation and fire protection. As of April 17, 2028, this project is included in the Town of Jupiter's Fiscal Year 2024-2028 CIP and funding is allotted for construction in FY 2025. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Water / Sewer

$431,600.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
244
Active Projects
119
Bidding Soon
1,573
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 1, 2026

Project location map

Multiple Locations, Jupiter, FL


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.