BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 15, 2019 at 8:00 PM

Updated November 12, 2025

Site work for a civil project in Moore Haven, Florida. Completed plans call for site work for a bridge / tunnel; and water / sewer project.

*Contract Award Date: April 11, 2019 Contract Award Number: W912EP19C0012 Contract Award Dollar Amount: $23,596,317.50 Contract Line Item Number: 0001 THRU 0042 Contractor Awarded Name: KIEWIT INFRASTRUCTURE SOUTH CO. Contractor Awarded DUNS: 055076616 Contractor Awarded Address: 8403 SOUTH PARK CIRCLE, SUITE 655 ORLANDO, Florida 32819 United States The work includes removing an existing Herbert Hoover Dike Culvert HP-5 and the construction of new water control structure S-284 within the same footprint as the existing structure. The new construction of S-284 will require the installation of a steel sheet pile cofferdam with earthen plugs on the lakeside and an earthen cofferdam on the landside. These features are required to excavate, remove the existing structure, and construct the new S-284. The landside cofferdam will also serve as a bypass road for the Contractor, Government, Seminole Tribe of Florida (STOF), and State personnel and other construction Contractors (construction equipment) not associated with this contract. Dewatering will be required to control the groundwater in accordance with contract specifications. The structure will include cast-in-place reinforced concrete foundations, headwalls, and culvert. A combination flap/slide gate will be installed at the lakeside headwall. S-284 will consist of one (1) 8-foot by 8-foot culvert. In addition to the 8-foot by 8-foot culvert, a 42-inch conduit will be installed through the embankment just south of the S-284 structure for future pumped water supply. The pumps and infrastructure will be installed under a separate contract. Once the embankment is constructed to the lines and grades shown, riprap will be installed as shown, and a control building will be installed on the work platform. Work also includes operation of the by-pass pump system, grassing and turbidity monitoring. After completion of S-284 construction, the steel sheet pile and earthen cofferdams will be removed. The period of performance for this procurement is a total of 869 calendar days plus 90 calendars to establish grass and sodding from issuance of the Notice to Proceed. Award will be made to the offeror whose proposal represents the best value to the Government. Proposals will be evaluated in the areas of technical merit, past performance, small business participation and price. Magnitude of construction is between $10,000,000.00 and $25,000,000.00. This is an unrestricted acquisition. All responsible offerors are encouraged to participate. Response date of 05 December 2018. Solicitation will be issued in electronic format only and will be posted on the Federal Business Opportunities (FBO) website: https://fedbizopps.gov/. In order to receive notification of any amendments to this solicitation, interested vendors must REGISTER AS AN INTERESTED VENDOR on the Federal Business Opportunities website. If you are not registered, the Government is not responsible with providing you with notification of any changes to this solicitation. You must be registered in the System for Award Management (SAM) in order to receive an award from this solicitation. The SAM website can be located at https://www.sam.gov. NAICS Code 237990, size standard $36.5 million.

Award

Bridges / Tunnels

$23,596,318.00

Public - Federal

Site Work

150

95

31

6

Subscribe For Documents

107 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
76
Active Projects
3
Bidding Soon
1,462
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 12, 2019

April 1, 2019

Project location map

To Be Determined, Moore Haven, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.