BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 1, 2019 at 7:00 PM

Updated May 22, 2025

Site work and renovation of a bridge / tunnel in Fayetteville, Pennsylvania. Completed plans call for the renovation of a bridge / tunnel; and for site work for a bridge / tunnel.

Work included under this contract consists of all site work to suit project preparation, execution and completion. This includes demolition of existing structure. It will be replaced with a precast concrete arch (24'-0" x 6'-9 5/8") with an 18'-0" clear roadway width. Replacement at the structure will also include selected material surfacing, rock lining, and architectural surface treatment. Responsive bidders must hold a current small business certification from PA Department of General Services (DGS) Failure to meet this requirement may be cause for rejection. Engineer's Estimate: $100,000 to $500,000

Award

Bridges / Tunnels

$218,075.00

Public - State/Provincial

Renovation, Site Work

16

1

5

14

Subscribe For Documents

45 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
419
Active Projects
138
Bidding Soon
2,761
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 14, 2019

March 18, 2019

Project location map

10099 Lincoln Way E, Fayetteville, PA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.