Demolition, site work, renovation and addition to an educational facility in Duncan, South Carolina. Completed plans call for the addition of a 15,750-square-foot educational facility; for the demolition of a educational facility; for the renovation of a educational facility; and for site work for a educational facility.
Spartanburg School District Five is soliciting proposals for CM at Risk for two construction projects (elementary school expansion and new high school baseball facility). Project One is construction of an approximately 15,750 SF expansion/addition at Abner Creek Academy, 2050 Abner Creek Rd, Duncan, SC. The existing building is just over ten years old and serves students in grades preK through 4. The expansion project has an estimated budget of $4,250,000, including architect/engineering fees, site work, pre-constructions, construction costs, furniture, fixtures, equipment and utilities. The project includes two Kindergarten classrooms and one additional wing containing eight classrooms, a work room, offices, storage rooms, and restrooms. Construction is load bearing CMU and brick veneer with steel bar joists with a mechanical equipment platform above the classrooms. Approximate timeline for this project is May 2019-June 2020. The District anticipates a substantial completion date, at which time construction work and outfitting with technology, furniture and equipment must be complete and ready for occupancy of July 2020. Project Two is a two-phase project to construct a new baseball field and parking lot at James F. Byrnes High School, 150 East Main St, Duncan, SC. Estimated budget for this project is $5,124,000. Phase One will be the construction of a new baseball field to include all site work necessary to install the field including grading, grassing, irrigation, parking, lighting, and fencing, etc. The stadium will have aluminum bleachers to seat 500, CMU dugouts, and a CMU concessions, restroom, and press box building. Approximate timeline for this phase is April 2019- November 2019. Phase Two will be the demolition of existing Byrnes HS parking lot and construction of a new parking lot. Work to include all site work necessary for new 491 space parking lot including grading, paving, curb & gutter, lighting, and sidewalks. Approximate timeline for this phase is May 2020-July 31, 2020. Construction Cost Range: Project One - $4,250,000. Project Two - $5,125,000 Questions must be received by February 22, 2019 - 1:00 PM.
Award
Educational
$4,250,000.00
Public - County
Addition, Demolition, Renovation, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 7, 2019
April 8, 2019
Multiple Locations, Duncan, SC
Related To This Project
Duncan, SC
Bid Date: Sep 29 2022
Duncan, SC
Bid Date: Apr 07 2022
Duncan, SC
Bid Date: Apr 06 2022
Duncan, SC
Bid Date: Apr 06 2022
Duncan, SC
Bid Date: May 04 2022
Duncan, SC
Bid Date: Jun 30 2022
Duncan, SC
Bid Date: Jul 26 2022
Duncan, SC
--
Duncan, SC
Bid Date: Nov 02 2022
Spartanburg Community College - Tyger River Building 87 and 89 Warehouse Reroofing Project - 4833257
Duncan, SC
Bid Date: Sep 28 2022
Piedmont, SC
Bid Date: May 21 2019
Simpsonville, SC
--
Spartanburg, SC
Bid Date: Jun 13 2019
Conway, SC
Bid Date: May 06 2021
Clemson, SC
Bid Date: Jul 01 2021
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.