Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a mixed-use development in Brooklyn Center, Minnesota. Conceptual plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
Participate in the City of Brooklyn Center's project to reconstruct Humboldt Avenue (CSAH 57) from 53rd Avenue to 57th Avenue in the City of Brooklyn Center. The existing roadway (last reconstructed in 1930) includes a rural environment that lacks curb and storm water structures to provide adequate drainage. Humboldt Avenue (CSAH 57) is one of the few remaining rural county roadways within the I-494/I-694 ring. The City of Brooklyn Center has indicated an interest in leading this capital project since there are city owned utilities that warrant replacement based on their current age and condition. The existing sanitary sewer consists of vitrified clay pipe (installed in 1952) that is experiencing root intrusion along approximately 50% of the system. The existing water system consists of cast iron pipe (installed in 1966) that is currently experiencing corrosion. Staff recommends performing roadway reconstruction activities in conjunction with utility replacement to minimize capital project costs and reduce delays to the travelling public. It is anticipated that the proposed project would upgrade the corridor to a suburban design to better serve its users. Project elements likely will include: new pavement, curb and gutter to provide sufficient drainage, and upgraded ADA accommodations to better serve persons with limited mobility. Additionally, in the 2000s, Community and Economic Development completed a reconstruction project on Humboldt Avenue (CSAH 57) between Victory Memorial Drive and 53rd Avenue as part of the Humboldt Greenway partnership with the City of Minneapolis. This project presents an opportunity to implement a similar roadway design and streetscaping elements to encourage walking and biking along the corridor. As February 16, 2023, this project is currently in the FY 2023 - 2027 CIP. Funding for this project is allotted in the city's capital improvement plan for construction FY 2025. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2025. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Roads / Highways
$700,000.00
Public - County
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 2, 2024
County Rd 57, Brooklyn Center, MN
Related To This Project
Brooklyn Center, MN
Bid Date: Nov 16 2023
Brooklyn Center, MN
Bid Date: Oct 31 2023
Brooklyn Center, MN
--
Brooklyn Center, MN
Bid Date: Mar 28 2024
Brooklyn Center, MN
Bid Date: Feb 08 2024
Brooklyn Center, MN
Bid Date: Mar 14 2024
Brooklyn Center, MN
--
Brooklyn Center, MN
Bid Date: May 28 2024
Brooklyn Center, MN
--
Brooklyn Center, MN
Bid Date: Jul 12 2018
Brooklyn Center, MN
Bid Date: Jan 18 2022
Brooklyn Center, MN
--
Brooklyn Center, MN
--
Brooklyn Center, MN
Bid Date: Jun 08 2023
Brooklyn Center, MN
Bid Date: May 25 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.