BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 9, 2020 at 7:00 PM

Updated July 16, 2025

Site work and new construction of an educational facility in Norfolk, Nebraska. Completed plans call for the construction of a 32,627-square-foot educational facility; and 14,518-square-foot educational facility.

This project will consist of two (2) new main buildings, Veterinary Technology Building and a Large Animal Handling/Farm Operations Building with site development and support structures for the farm relocation. The proposed area of work includes the site around the existing Chuck M. Pohlman Ag Complex and the surrounding 40 acres as well as the north 40 acres. The property is currently zoned Agriculture and that use will remain the same in an Educational setting. 1. The Veterinary Technology Building (Drawings set 1 of 2) is new construction of approximately 32,627 square feet single-story building with mechanical mezzanine. This building includes the elements of classrooms, clinical pathology labs and clinical laboratories to educate students in all aspects of veterinary technology. Related animal holding, examination and diagnostic equipment training and an animal surgical suite are also included in the facility. Modular AHUs will be utilized to condition a majority of the building. The Surgery Suite (Surgery Room, Pre-Op, Post-Op and Instrument Prep) will require an HVAC system connected to the generator. A packaged system (DX cooling, gas-fired heat) not connected to the building chilled / heating hot water systems will be utilized to satisfy this requirement. Additional exhaust will be provided for animal holding areas to minimize odors. 2. The Farm Operations and Large Animal Building (Drawing set 2 of 2) is new construction of approximately 14,518 square feet high-bay building with viewing mezzanine. The building provides indoor storage for the farm equipment and maintenance area to perform routine maintenance on the equipment in addition to the offices and general education space with penning and livestock equipment for large animal handling needs. The related farm operations structures including outdoor livestock pens, sheltered areas, hoop barns, calving barn and ancillary structures. The Maintenance and Farm Equipment Storage will be heated and ventilated only. The smaller remaining office, restroom, mechanical and veterinary med storage square footage will be fully conditioned space. As of November 9, 2020, this project is under construction and expected to be completed winter 2020.

Under Construction

Educational

$23,000,000.00

Public - State/Provincial

New Construction, Site Work

230

60

73

6

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
84
Active Projects
61
Bidding Soon
583
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 23, 2020

April 1, 2020

Project location map

Multiple Locations, Norfolk, NE

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.