BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 3, 2019 at 7:00 PM

Updated September 15, 2023

Site work, paving and outdoor lighting for a mixed-use development in Norman, Oklahoma. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; for outdoor lighting for a sidewalk / parking lot; and water / sewer project.

Construction of a 193-space asphalt parking lot with landscaping, irrigation, lighting, and on-site underground storm sewer detention. The work contemplated includes the furnishing of all the necessary labor, tools, equipment, materials, supplies and miscellaneous items required for the Sarkeys Parking Lot project in accordance with the Contract, Drawings and Specifications including Addenda, as prepared by Garver Engineers, LLC, dated October 25, 2019. 1. Copper building wire rated 600 V or less. 2. Connectors, splices, and terminations rated 600 V and less. A pre-bid conference will be held at 1:30 p.m. on Friday, November 22, 2019 at The University of Oklahoma Architectural and Engineering Services, 201 Stephenson Parkway, Suite 1300A, Norman, OK 73019.

Post-Bid

Sidewalks / Parking Lot

$400,000.00

Public - State/Provincial

Outdoor Lighting, Paving, Site Work

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
113
Active Projects
50
Bidding Soon
803
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 5, 2019

December 19, 2019

Project location map

To Be Determined, Norman, OK

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.