Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 15, 2022 at 8:00 PM

Updated October 24, 2023

Site work for a water / sewer project in Norman, Oklahoma. Conceptual plans call for site work for a water / sewer project.

The Wastewater Master Plan (WWMP) identified sewer interceptor needs throughout Norman to accomodate full build-out of the NORMAN 2025 Plan. The citizens of Norman approved an ongoing excise tax (Fund 322) to provide capacity for future development. Staff has recently prepared cost estimates to serve additional area in SE Norman which currently will gravity flow to the Summit Valley Lift Station (LS). The Summit Valley interceptor will extend northerly to the existing Eastridge LS and allow this LS constructed in the 1980's to be removed from service. The existing Summit Valley LS has capacity to serve the area served by the Eastridge LS. The lift station could initially be funded by developers and/or the NUA with a portion of the funding paid back as additional areas develop. As of September 15, 2022, this project is included City of Norman FY 2021-2025 CIP. The city is currently in the process of securing funding for this project. Bidding for designer, contractor and firm construction start date have not been released. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Conceptual

Water / Sewer

$284,600.00

Public - City

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
178
Active Projects
90
Bidding Soon
897
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 19, 2022

Project location map

To Be Determined, Norman, OK

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed