BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and paving for a mixed-use development in Fresno, California. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

**As of February 10, 2020, this project has not yet been awarded. The scope of work includes, but is not limited to:This project consists of rehabilitating four streets in the South Van Ness Industrial area of Fresno. These streets include California Avenue - Cherry to East Avenues, Pearl Avenue - Hamilton to Butler Avenues, East Avenue - California to Butler Avenues and Hamilton Avenue - Monterey to East Avenues. The work for these streets include resurfacing or reconstructing the streets, installing new sidewalk and drive approaches, installing new street lighting, improving existing railroad crossings and new curb ramps. Utility relocation is also included in this project. Existing fire hydrants will need to be relocated and existing utility poles will be relocated. The City of Fresno hereby notifies all Bidders that no person shall be excluded from participation in, denied any benefits of, or otherwise discriminated against in connection with the award and performance of any contract on the basis of race, religious creed, color, national origin, ancestry, physical disability, mental disability, medical condition, marital status, sex, age, sexual orientation, ethnicity, status as a disabled veteran or veteran of the Vietnam era or on any other basis prohibited by law.The City will carry out applicable federal requirements in the award and administration of any contract awarded hereunder. This is a federal project funded with financial assistance from theU.S. Department of Commerce, U.S. Economic Development Administration (EDA). Type of award lump sum. Bid valid 64 days. Liquidated damages $1000 per day. Estimated bid value $3,672,318.00. Project duration 130 working days from date of notice to proceed.

Award

Roads / Highways

$3,290,000.00

Public - City

Paving, Site Work

102

11

39

6

Subscribe For Documents

40 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
40
Active Projects
27
Bidding Soon
401
All Active Projects
173
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 28, 2020

March 30, 2020

img_map_placeholder

Multiple Locations, Fresno, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.