Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published March 31, 2020 at 8:00 PM
Updated September 15, 2023
Renovation of a residential development in Charleston, South Carolina. Completed plans call for the renovation of a residential development.
Architectural: A new kynar finished aluminum roofing system and roof insulation system will be Provided. Portions of the existing 2nd floor gypsum ceiling board that show visible Signs of water damage will be replaced. Note that the majority of the existing ceiling System will remain in place. Structural: The existing stick-built wood roof framing will be replaced with new prefabricated Wood roof trusses and plywood roof decking. The existing ceiling system will remain in Place. Mechanical: A new hvac split system will be provided to replace-in-kind (rik) the existing attic Mounted air handler, the outdoor heat pump, and attic ductwork. This work is a Delegated design item for the contractor. Electrical: New wiring will be provided to replace-in-kind (rik) all existing wiring for electrical Devices fed from the attic space above. Existing fixtures and devices will remain. New (labeled) junction boxes will be added at all work transitions. No new wiring is required In non-attic spaces. This work is a delegated design item for the contractor. Fire protection: New piping will be provided to replace-in-kind (rik) all existing sprinkler piping and heads In the attic space above. This work is a delegated design item for the contractor. Refer to all documents for full extent of work. Please direct all questions concerning scope of work and specifications to the Project Architect, Mr. Brian Fessler, Project Manager via email at bfessler@mcmillanpazdansmith.com or CHA Project Manager, Ms. Marymims Goldman via email at mmg@chacity.org. Any / all such interpretations and any supplemental instructions will be in the form of a written Addenda to the Specifications that, if issued, will be released on Monday, March 2, 2020 by 4:30pm. The Housing Authority encourages minority and women-owned businesses, Section 3 Businesses & Section 3 Residents to participate in its on-going purchasing of goods and services. This contract will obligate the contractor and subcontractors not to discriminate in employment practices and to comply with the Davis Bacon-Act and Section 3 of the Housing and Urban Development Act of 1968. CHA reserves the right to wave irregularities and to reject any / all bids.
Award
Residential Subdivision
$159,777.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 11, 2020
April 10, 2020
24 Engel St, Charleston, SC
Related To This Project
Charleston, SC
Bid Date: Dec 28 2021
Charleston, SC
Bid Date: Jul 22 2021
Charleston, SC
Bid Date: Jan 16 2020
Charleston, SC
Bid Date: Sep 17 2020
Charleston, SC
Bid Date: Mar 03 2020
Charleston, SC
Bid Date: Dec 28 2021
Charleston, SC
Bid Date: Oct 14 2021
Charleston, SC
Bid Date: Jun 23 2022
Charleston, SC
Bid Date: Dec 02 2021
Charleston, SC
Bid Date: Aug 16 2022
Charleston, SC
Bid Date: Mar 09 2021
Charleston, SC
Bid Date: Nov 05 2020
Charleston, SC
Bid Date: Dec 15 2020
Charleston, SC
Bid Date: Feb 09 2022
Charleston, SC
Bid Date: Jul 15 2022
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed
