BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 6, 2020 at 8:00 PM

Updated November 15, 2023

Renovation of an educational facility in Madison, Wisconsin. Completed plans call for the renovation of a educational facility.

In general, the work consists of: Replacement of approx.9400 sq. feet of failed ballasted EPDM (IRMA) with new ballasted .060 black Ethylene Propylene-Diene-Monomer (EPDM) over & 1/4" per ft. 4-way tapered insulation to obtain 20-yr No-Dollar-Limit (NDL) labor and material warranty and increase R-value to new system rated minimum-average R-25.2. The system also includes all new metal flashings & installation of new cell tower stands. Any comments or questions shall be directed to Tim Walsdorf at H-CAD Inc. Email bigh0@frontier.com Telephone (920) 8 894-7089. Cell (920) 286-2350.

Under Construction

Educational

$114,780.00

Public - State/Provincial

Renovation

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
257
Active Projects
152
Bidding Soon
1,656
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 27, 2020

July 1, 2020

Project location map

625 Babcock Dr, Madison, WI

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.