BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and new construction of a mixed-use development in Milford, Utah. Completed plans call for the construction of a 3,100-square-foot fire / police facility; for site work for a fire / police facility; road / highway; for paving for a road / highway; and water / sewer project.

All documents required for bid submittal will need to be entered. Bidders should submit bids early to make sure that all documents are received in the planroom before the bid opening. The work to be performed under this project shall consist of furnishing all labor, materials and equipment required to construct the facilities and features called for by the Contract Documents and as shown on the Drawings . Bidders are responsible to maintain current and correct contact information and check the planroom often to receive updates or additional documents/changes/ amendments. This project includes the construction of an approximate 3,100 sq. ft. building and miscellaneous site work grading, utility, drainage, landscaping, and surfacing. This project is funded by Utah Permanent Community Impact Fund Board. The Enginer for this Contract will be Sunrise Engineering, Incorporated and they will be represented by Trent Brown, as Project Manager. The last day to submit questions about the BID, Contract Documents and Drawings will be Thursday May 18th, 2020 at 5:00 PM. An addendum may be published thereafter to make clarifications to the Contract Documents and Drawings as required.

Award

Fire / Police

$675,837.00

Public - County

New Construction, Paving, Site Work

98

22

4

3

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
6
Active Projects
3
Bidding Soon
46
All Active Projects
18
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 21, 2020

July 20, 2020

img_map_placeholder

26 S 100 W St, Milford, UT


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.