BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 23, 2025 at 7:00 PM

Updated February 13, 2025

Site work and paving for a mixed-use development in Milford, Utah. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Full pavement section reconstruction of the roadway including subbase, untreated base course, and new bituminous pavement surface. Approximately 220 ft of non-contiguous curb and gutter replacement and construction of new valley gutter. Length of roadway reconstruction is contingent on costs and available funding and may be adjusted. Removal of existing pavement materials to be provided by OWNER. Subbase for reconstruction will be provided from the OWNER's stockpiles.

Post-Bid

Roads / Highways

$300,000.00

Public - City

Paving, Site Work

12

11

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
15
Active Projects
4
Bidding Soon
77
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 12, 2025

March 14, 2025

Project location map

Multiple Locations, Milford, UT


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.