Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published November 2, 2021 at 8:00 PM
Updated June 26, 2025
Site work for a municipal facility in Milford, Utah. Completed plans call for site work for a municipal facility.
Compliance with the Davis-Bacon Act is not required for this project. PROJECT LOCATION AND DESCRIPTION A. The Topache Peak Phase I Project area is in the center of Beaver County about 31 miles west of Beaver and just southwest of Milford. General reclamation area boundaries of the Topache Peak Phase I Project are shown on the attached location maps (see Chapter 7, Maps 1 and 2) and are described in this section. B. The Topache Peak Phase I Project consists of approximately 64 abandoned hardrock precious and base metal mine openings or related features 3 to 8 miles west and southwest of the small town of Milford. There are 231 openings that are not part of this WORK. A future project will address the closure of these 231 mine openings. General access to all of the sites in the Topache Peak Phase I Project will be described from Penny's Diner on the western edge of the central Utah town of Milford in Beaver County. C. Access: To reach the Topache Peak Project area from Beaver, leave Interstate I-15 at Exit 112. Proceed another 0.3 miles onto West Main Street and into Beaver. Continue 1.8 miles to West Center Street (start of State Highway 21) and turn right. Travel west 30.7 miles to Milford. Cross the railroad tracks into town onto South Main Street. Continue through town to West Center Street and turn left, heading west on Highway 21 toward Ely, Nevada. On the outskirts of Milford is the Oak Tree Inn and Penny's Diner. Access to all sites is described from this point as shown on Map 19C. Continue northwest on Highway 21 for 2.6 miles (inventory map sheet 19E) to reach the Powerline road in the northeast corner of Section 3, which is the access road for the eastern sites located in T28S, R11W, Sections 28, 29, 30, and 31 as well as the eastern half of T28S, R12W, Section 25. The sites in the western half of the project area are reached by traveling an additional 2.8 miles northwest on Highway 21, past the Powerling D. The formal project boundary takes in the following sections, although mines occur in only a portion of this area: Township 27 South, Range 11 West, Sections 31, 32, and 33; Township 28 South, Range 11 West, Sections 27 through 34; and Township 28 South, Range 12 West, Sections 1 through 3, 10 through 15, and 22 through 27. E. The Topache Peak Phase I Project is mapped on the Milford NW, Milford, Milford Flat, and Picacho Peak USGS 7.5 minute quadrangle and on the Wah Wah Mts. South USGS 30'x60' (1:100k) quadrangle. Question Submission Close Date 10/4/2021 2:00 PM MDT
Award
Municipal
$199,480.00
Public - State/Provincial
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 6, 2021
November 30, 2021
775 W Center St, Milford, UT
Related To This Project
Milford, UT
Bid Date: Sep 30 2025
Milford, UT
Bid Date: Oct 01 2025
Milford, UT
Bid Date: Oct 16 2025
Milford, UT
Bid Date: Jul 30 2020
Milford, UT
Bid Date: Feb 12 2025
Milford, UT
Bid Date: Nov 22 2024
Milford, UT
Bid Date: Sep 20 2024
Milford, UT
Bid Date: Apr 16 2024
Milford, UT
Bid Date: Feb 14 2024
Milford, UT
--
Milford, UT
Bid Date: May 21 2020
Milford, UT
Bid Date: Jul 31 2020
Milford, UT
Bid Date: Mar 14 2023
Milford, UT
Bid Date: Jun 24 2022
Milford, UT
Bid Date: Feb 20 2018
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
