Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 1, 2020 at 8:00 PM
Updated May 7, 2025
Site work for a water / sewer project in Hallandale Beach, Florida. Completed plans call for site work for a water / sewer project.
Access to the building will require time for temperature taking and wearing of a face covering. All must plan to obtain access to the City Clerk's Office without being late. No late responses will be accepted. PURPOSE: The City of Hallandale Beach is seeking sealed bids from qualified general contractors with experience in water main installation and roadway construction and restoration. The work includes the Contractor furnishing all labor, materials, tools, equipment, machinery, and service necessary for the construction and installation of approximately 3,250 LF of proposed 12-inch Polyvinyl chloride (PVC) Water Main along Foster Road from NW 10th Avenue to NW 4th Avenue, and approximately 2, 400 LF of 8-inch PVC water main along NW 9th Street from NW 9th Avenue to NW 8th Avenue, along NW 8th Avenue from NW 9th Street to Foster Road along the side streets as indicated in the attached Exhibits A and B. The existing 6" water main along Foster Road will be abandoned in place. There is an existing 4-inch WM along NW 9th Street between NW 8th Avenue and NW 7th Terrace which will be abandoned in place. LAST DAY FOR QUESTIONS: Any questions are to be submitted via email to alues@cohb.org no later than June 12, 2020 at 11:00 a.m. Answers to questions received before the deadline will be released via addendum. Changes, if any, to the scope of the services or Bid procedures will be transmitted only via written addendum and available on the City's portal.This Bid/Project contains Minimum Qualification Requirements (MQRs) that vendors must meet in order to respond. Firms must read the MQRs before submitting a response. 10% BID BOND: Proposer must provide with the submission of the Bid a Security Bid Bond issued by a surety company licensed to do business in the state in an amount equal to ten percent (10%) of the Bid Price submitted. PERFORMANCE AND LABOR MATERIALS PAYMENT BOND: 100% of total contract price awarded submitted fifteen (15) days after receipt of Notification of Award. CONE OF SILENCE: Sec 23-14 - Cone of Silence There is to be no communication between proposing firms and City staff regarding this solicitation. Should any firm contact you related to this solicitation, please direct the communication to the Procurement Department at (954) 457-1333. Access to the City Commission building will require time for temperature taking and will require the wearing of a face covering. All must plan accordingly to be allowed to the meeting in a timely manner.
Post-Bid
Water / Sewer
$1,496,057.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 1, 2020
September 1, 2020
Foster Rd, Hallandale Beach, FL
Related To This Project
Hallandale Beach, FL
--
Hallandale Beach, FL
Bid Date: Jun 23 2025
Hallandale Beach, FL
Bid Date: Jul 10 2025
Hallandale Beach, FL
Bid Date: Jul 10 2025
Hallandale Beach, FL
Bid Date: Jul 21 2025
Hallandale Beach, FL
Bid Date: Oct 04 2021
Hallandale Beach, FL
Bid Date: May 28 2020
Hallandale Beach, FL
Bid Date: Jul 31 2025
Hallandale Beach, FL
Bid Date: Dec 22 2020
Hallandale Beach, FL
Bid Date: May 17 2021
Hallandale Beach, FL
Bid Date: Jun 16 2025
Hallandale Beach, FL
Bid Date: May 19 2025
Hallandale Beach, FL
Bid Date: May 19 2025
Hallandale Beach, FL
Bid Date: May 06 2025
Hallandale Beach, FL
--
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
