BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 1, 2020 at 8:00 PM

Updated May 7, 2025

Site work for a water / sewer project in Hallandale Beach, Florida. Completed plans call for site work for a water / sewer project.

Access to the building will require time for temperature taking and wearing of a face covering. All must plan to obtain access to the City Clerk's Office without being late. No late responses will be accepted. PURPOSE: The City of Hallandale Beach is seeking sealed bids from qualified general contractors with experience in water main installation and roadway construction and restoration. The work includes the Contractor furnishing all labor, materials, tools, equipment, machinery, and service necessary for the construction and installation of approximately 3,250 LF of proposed 12-inch Polyvinyl chloride (PVC) Water Main along Foster Road from NW 10th Avenue to NW 4th Avenue, and approximately 2, 400 LF of 8-inch PVC water main along NW 9th Street from NW 9th Avenue to NW 8th Avenue, along NW 8th Avenue from NW 9th Street to Foster Road along the side streets as indicated in the attached Exhibits A and B. The existing 6" water main along Foster Road will be abandoned in place. There is an existing 4-inch WM along NW 9th Street between NW 8th Avenue and NW 7th Terrace which will be abandoned in place. LAST DAY FOR QUESTIONS: Any questions are to be submitted via email to alues@cohb.org no later than June 12, 2020 at 11:00 a.m. Answers to questions received before the deadline will be released via addendum. Changes, if any, to the scope of the services or Bid procedures will be transmitted only via written addendum and available on the City's portal.This Bid/Project contains Minimum Qualification Requirements (MQRs) that vendors must meet in order to respond. Firms must read the MQRs before submitting a response. 10% BID BOND: Proposer must provide with the submission of the Bid a Security Bid Bond issued by a surety company licensed to do business in the state in an amount equal to ten percent (10%) of the Bid Price submitted. PERFORMANCE AND LABOR MATERIALS PAYMENT BOND: 100% of total contract price awarded submitted fifteen (15) days after receipt of Notification of Award. CONE OF SILENCE: Sec 23-14 - Cone of Silence There is to be no communication between proposing firms and City staff regarding this solicitation. Should any firm contact you related to this solicitation, please direct the communication to the Procurement Department at (954) 457-1333. Access to the City Commission building will require time for temperature taking and will require the wearing of a face covering. All must plan accordingly to be allowed to the meeting in a timely manner.

Post-Bid

Water / Sewer

$1,496,057.00

Public - City

Site Work

41

1

4

5

Subscribe For Documents

38 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
248
Active Projects
115
Bidding Soon
1,740
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 1, 2020

September 1, 2020

Project location map

Foster Rd, Hallandale Beach, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.