Site work for a water / sewer project in Santa Cruz, California. Completed plans call for site work for a water / sewer project.

**As of 8/19/2020 Project start date will be sometime in 2 months from now . The work to be done, in general, consists of removing existing sanitary sewer pipe abandoning existing sewer manholes and construction a new sewer manhole. Additionally, work will include installation of pipe adapters, sections of new sewer pipe, replacement of selected manhole frames and covers, modification of existing manholes, installation and re- connection of residential sanitary sewer laterals, and restoration of surrounding pavement and traffic striping. Engineer's Estimated Cost: $550,000 to $800,000 Pre-Qualification for Bidders: Not Required Project Duration: 60 Calendar Days Liquidated Damages: $1,000.00 Per Calendar Day Bid Bond Percentage: 10% Technical questions regarding the plans and specifications shall be directed to Steve Wolfman, Senior Civil Engineer, at 831-420-5428. The successful bidder will be required to furnish a Labor and Material Bond in the amount equal to one hundred (100) percent ofthe contract price, and a Faithful Performance Bond in an amount equal to one hundred (100) percent ofthe contract price, said bonds to be issued by a corporate surety company approved by the City Attorney

Award

Water / Sewer

$668,000.00

Public - City

Site Work

7

7

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
337
Active Projects
138
Bidding Soon
2,213
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 28, 2020

August 27, 2020

Project location map

Walnut Ave, Santa Cruz, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.