BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Winston Salem, North Carolina. Completed plans call for site work for a playground / park / athletic field; for paving for a playground / park / athletic field; and sidewalk / parking lot.

Brushy Fork Park - Site & amenity construction at 4.28 acre park north of NC Hwy 421. Renovations include: 0.21 acres of disturbance in and around existing shelter and east end of parking area; remove and replace existing play structures with new equipment, engineered mulch; concrete border and underdrains; remove existing asphalt path and provide new ADA concrete walk to relocated playground and existing Shelter; add two new concrete ADA parking spaces, storm drainage and new shade tree. Winston Lake Park - Site & amenity construction at this 229 acre park. Shelter #1 renovations include: 0.50 acres of disturbance in and around existing shelter 1 and existing playground area; remove and replace existing play structures with new equipment, engineered mulch; concrete walks and underdrains; remove existing asphalt paving concrete walks, paving and provide new circular concrete walk around playground and connect to existing shelter; add storm drainage; install new native flowering and shade trees. Shelter #3 renovations include: 0.25 acres of disturbance in and around existing shelter 3 and existing playground area; remove and replace existing play structures with new equipment, engineered mulch; concrete walks and underdrains; remove fencing and drainage; provide ADA concrete walk access and walk/steps from parking to playground and connect to existing shelter; add storm drainage, flowering tree and riverstone. Shelter #4 renovations include: 0.15 acres of disturbance in and around existing shelter 4 and existing playground area; remove and replace existing play structures with new equipment, pip surfacing; concrete walks, steps and underdrains; remove existing concrete walks, paving and provide new ADA concrete walk from parking to connect to existing shelter & new playground; add fencing, storm drainage, groundcover, reinstall benches and grill. Subcontracting trades identified are as follows: Removal and Disposal of old equipment Excavation and Installation of new Engineered Mulch Play Surface & Underdrains Installation of New Poured in Place (P.I.P) Play Surfacing & Underdrains Site work including Clearing & Grubbing, Demolition, Erosion Control and Grading Storm Drainage & Piping Asphalt Paving Aggregate Base Course Paving Concrete Curbing/Border Concrete Paving Permanent Seeding Landscaping and Mulching For technical questions regarding this project, please submit questions in writing to Darren Redfield at darrenmr@cityofws.org for response to all by addendum. End of Question Period is 5:00 PM, August 26, 2020. Bidders are hereby notified that they must be properly licensed as required by Chapter 87 of the North Carolina General Statutes. Construction time: ~November 16, 2020 to May 31, 2021 (190 calendar days). M/WBE goals apply. Minority and Women Business Enterprise goals apply: 6% MBE, 6% WBE The City reserves the right to waive any informalities in the bidding and to reject any or all proposals.

Award

Playgrounds / Parks / Athletic Fields

$699,573.00

Public - City

Paving, Site Work

30

11

9

5

Subscribe For Documents

31 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
198
Active Projects
119
Bidding Soon
1,784
All Active Projects
785
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

September 3, 2020

November 16, 2020

May 31, 2021

img_map_placeholder

Multiple Locations, Winston Salem, NC

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.