Published November 11, 2020 at 7:00 PM

Updated October 1, 2024

Site work for a bridge / tunnel in Kimberton, Pennsylvania. Completed plans call for site work for a bridge / tunnel.

The project involves the renovation of an existing stone arch bridge including repointing and resetting of existing stonework, application of a shotcrete lining, and installation of new curbing. Project is for the repair of the existing stone arch culvert under Kimberton Road in East Pikeland Township in the village of Kimberton. The work will require bypass pumping of the stream in order to apply a gunite lining to the barrel of the arch. The walls and parapets are to be repointed and loose stones shall be reset. A new concrete curb and wood rail are to be installed on the roadway. Proposals shall be accompanied by a bid security in the amount of ten percent of the total amount of the proposal. Proposals shall be effective for 90 days from the date of opening. The successful low bidder will be required to provide a 100% performance bond or certified check, a 100% payment bond or certified check, a workers compensation affidavit, and a certificate of insurance naming East Pikeland Township and LTL Consultants as additional insureds, all within 20 days after the contract is awarded. East Pikeland Township reserves the right to waive any non-material defects or irregularities in the bid, and to reject any or all bids or portions thereof. East Pikeland Township, in accordance with Title VI of the U.S. Civil Rights Act of 1964 and Parts 21 and 23 of 49 C.F.R., notifies all bidders that it will affirmatively insure that MBE/WBE will be afforded full opportunity to submit bids in response to this invitation and that no person will be discriminated against on the grounds of race, color, sex or national origin in consideration for an award. Project is to be substantially completed by December 31, 2020. Liquidated damages apply at the rate of $400.00 per calendar day. Proposals must include the Public Works Employment Verification Form completed by the Bidder. An addendum with this update as well as additional design changes will be issued by September 28, 2020 Clarification Deadline: 10/12/2020 5:00 PM

Award

Bridges / Tunnels

$88,782.00

Public - City

Site Work

5

1

4

13

Subscribe For Documents

72 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Unit Prices, Contract Modification Procedures, Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Closeout Submittals, Bonds
Division 03 - Concrete

Division 03 - Concrete

Cast-in-Place Concrete, Specialty Placed Concrete
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 26 - Electrical

Division 26 - Electrical

Lighting
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Grading
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Planting, Planting Preparation, Mulching, Turf and Grasses, Seeding
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment

Find More Local Projects

Within 75 Miles of This Project
367
Active Projects
186
Bidding Soon
2,904
All Active Projects
1,416
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 16, 2020

November 16, 2020

img_map_placeholder

2105 Kimberton Rd, Kimberton, PA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Kimberton Road Culvert Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.