BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 21, 2020 at 8:00 PM

Updated July 6, 2024

Site work for a bridge / tunnel in Didsbury, Alberta. Completed plans call for site work for a bridge / tunnel.

Install Smooth Wall Steel Pipe Culvert and Other Work 582: 02 B.F. 74680 - Carrying Hwy 582 over an Unnamed Watercourse, East of Didsbury Kilometre 33.064 to 33.064 Central Region APPROXIMATE QUANTITIES: 1 Lump Sum Excavation - Structural 43 Metres SWSP - Bore (1.83m OD) 1 Lump Sum Backfill 55 Cubic Metres Heavy Rock Riprap (Class 1) 70 Cubic Metres Grouting of Abandoned Culverts 1 Lump Sum Culvert Embankment and Berm Construction 100 Metres Straw Rolls Contractor to supply all materials. Award is subject to final approval.

Award

Bridges / Tunnels

$299,050.00

Public - State/Provincial

Site Work

4

1

2

4

Subscribe For Documents

79 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 21, 2020

November 16, 2020

Project location map

AB-582, Didsbury, AB

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.