Published May 23, 2025 at 8:00 PM

Updated November 8, 2025

Site work for a water / sewer project in Sarasota, Florida. Completed plans call for site work for a water / sewer project.

Installing an extension to a 30-inch potable water transmission main along Ashton Rd to the County's portable water Pump Station #3 site. PS #3 work will include improvements to control the refill of the water storage tanks, SCADA controls, piping configurations, limited paving & minor site improvements as stated herein. Question Deadline 04/04/2025 at 2:30 PM ET Summary IFB Construction Installing an extension to a 30-inch potable water transmission main along Ashton Rd to the County's portable water Pump Station #3 site. PS #3 work will include improvements to control the refill of the water storage tanks, SCADA controls, piping configurations, limited paving & minor site improvements as stated herein. The County anticipates to execute a Construction Contract for the duration of the Project. Refer to the Solicitation Documents and Attachments section for minimum qualifications, scope/specifications, and insurance requirements SCOPE OF WORK A. DESCRIPTION 1. The contractor performing the utility work covered by this Contract shall be qualified by the County to perform utility work. The Work to be completed consists of the furnishing of all labor, materials and equipment, and the performance of all Work included in this Contract. The Contractor shall perform all operations and incidentals necessary to complete the work in a turnkey condition. 2. Contractor shall utilize the County’s project management information system, e-Builder, for all project submittals including Requests for Information (RFI), Pay Applications, Interim Field Change Agreements (IFCAs), and meeting minutes, etc. as stated in Section 01300 - Submittals Scope of work summary includes: ? Pump Station # 3: ? Improvements to Pump Station # 3 to allow for tanks to be filled simultaneous with operation of the pumps, improve control of filling water storage tanks, and provide improved local process control. ? Adding a third pump with a design flow rate of 5,500-gpm (7.9 MGD) at 155 feet of TDH. These proposed improvements will increase the pump station's firm capacity to 15.8 MGD (23.7 MGD in total). ? Installation of approximately 350-LF of 30-inch DIP; 600-LF of 24-inch DIP; 10-LF of 16-inch DIP, and 10-LF of 14 -inch DIP water main as part of on-site piping improvements at Pump Station # 3. ? Transmission main: ? 1,800-LF of 30-inch DI water main to be installed by open cut method. ? 8,900-LF of 36-inch HDPE water main installed by Horizontal Directional Drill (HDD) method. Of this proposed 8,900-LF of HDD install, a total of approximately 1,500-LF will be sub-aqueous and cross beneath Red Bug Slough.

Award

Water / Sewer

$16,373,000.00

Public - County

Site Work

88

35

8

4

Subscribe For Documents

82 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
268
Active Projects
103
Bidding Soon
1,987
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 23, 2025

June 23, 2025

Project location map

Multiple Locations, Sarasota, FL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.