EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 2, 2021 at 7:00 PM

Updated October 1, 2024

Site work and paving for a bridge / tunnel in New Albany, Pennsylvania. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Contract No. 2 New Albany Borough - Main Street Bridge Repair This project is being financed by FEMA. The Contractor is subject to the provisions of the Pennsylvania Steel Products Procurement Act of 1978, P.L. 6, as amended. The Act and amendments require that the Contractor use or furnish only steel products (as defined in the Act and amendments) which have been produced in the United States. Each bid must be accompanied by a Certified or Bank Check; or Bid Bond naming payee or obligee, as applicable, New Albany Borough in the amount of five percent (5%) of the total amount of the bid as security for proper execution of the Agreement and submitting other documents as required in the Bidding Documents. The successful bidder will be required to execute the Agreement and to furnish performance and payment bonds, each of said bonds to be in the amount of one hundred percent (100%) of the Contract Price, all in the respective forms provided in the Bidding Documents. Contractor will also be required to furnish evidence of insurance coverage as required by the Bidding Documents. All bonds shall be executed by sureties named in the current list, "Companies Holding Certificates of Authority as Acceptable Sureties in Federal Bonds and as Acceptable Reinsuring Companies" as published in Circular 570 (as amended) by the Audit Staff, Bureau of Government Financial Operations, U.S. Treasury Department Attention is called to the fact that not less than the minimum salaries and wages as set forth in the Contract Documents must be paid on this project, and that the Contractor must ensure that employees and applicants for employment are not discriminated against because of their race, color, religion, sex or national origin. The successful bidder will be required to comply with prevailing minimum wages established by the PA Department of Labor & Industry Prevailing Minimum Wage Determination. Compliance with Act 127 of 2012 requiring all contractors and subcontractors to use e-Verify for verification of employment eligibility for all employees will be required. Verification form shall be provided to the New Albany Borough as a precondition of being awarded a contract. The New Albany Borough reserves the right to reject any or all bids or parts thereof or items therein, to waive any defects or irregularities in the Bids, and to accept any Bid which, in its judgment, is for its best interest. Bids shall remain open for a period of sixty (60) days from the date of Bid opening unless award is delayed by a required approval from a governmental agency, the sale of bonds, or the award of a grant or grants, in which event the Bids shall remain open for a period of one hundred twenty (120) days from the date of Bid opening. Awards shall be made only to responsible bidders that possess the potential ability to perform successfully under the terms and conditions of this procurement. Consideration shall be given to such matters as bidder integrity, compliance with public policy, record of past performance and financial and technical resources when determining responsibility

Award

Bridges / Tunnels

$80,050.00

Public - City

Paving, Site Work

11

8

Subscribe For Documents

95 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work by Owner, Price and Payment Procedures, Allowances, Cash Allowances, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Reference Standards, Quality Assurance, Field Samples, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Closeout Submittals, Bonds, Warranties
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Facility Remediation, Transportation and Disposal of Hazardous Materials
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel, Welded Wire Fabric Reinforcing, Cast-in-Place Concrete, Structural Concrete, Concrete Finishing, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Metals, Maintenance of Metals, Structural Metal Framing, Structural Steel Framing, Cold-Formed Metal Framing, Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing, Architectural Woodwork
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Joint Protection, Joint Sealants
Division 08 - Openings

Division 08 - Openings

Hardware, Door Hardware
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Gypsum Board, Tiling, Flooring, Wood Flooring, Painting and Coating
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts, Scaffolding
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Fill, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Base Courses, Concrete Base Courses, Rigid Paving, Concrete Paving, Curbs and Gutters, Planting, Planting Preparation, Mulching, Turf and Grasses, Seeding, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Water Utilities
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Lifts, Slings, Mobile Plant Equipment, Mobile Earth Moving Equipment, Compactors
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
113
Active Projects
74
Bidding Soon
933
All Active Projects
356
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 17, 2021

March 19, 2021

img_map_placeholder

Main St, New Albany, PA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

New Albany Borough - Main Street Bridge Repair - Contract No 2

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.