BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 16, 2021 at 8:00 PM

Updated November 15, 2023

Site work for a road / highway in San Francisco, California. Completed plans call for site work for a road / highway.

As of 3/16/2021 project was not yet been awarded. No estimated time frame yet. MTC is seeking bids for the construction of roadside infrastructure downstream of the San Francisco-Oakland Bay Bridge (SFOBB) toll plaza in the High Occupancy Vehicle (HOV) Lane1. The roadside infrastructure will be used to deploy a Vehicle Occupancy Detection (VOD) system as part of a Phase 2 pilot project. The VOD system will be integrated with the existing toll collection system and FasTrak back office system. VOD system equipment will be installed on poles located approximately 50- to 100-ft downstream of the toll plaza canopy and will be used to verify tolls based on vehicle occupancy in Lane 1 during HOV hours. The pilot project will include the following physical improvements: 1) Installation of two new Caltrans standard poles with mast arms (MTC-furnished items) and foundations, approximately 60-ft apart; 2) installation of new conduit, pull boxes, and cables for power and communications to the VOD system equipment; and 3) installation of VOD system equipment (i.e., cameras, illuminators, laser trigger, and pole-mounted cabinets) onto the two new Caltrans standard poles. The Civil Contractor will be responsible for performing the work described in improvements 1 and 2. Improvement 3 will be performed by others. Questions Due Date: Feb 17th 2021, 5:00 PM PST Good morning, When you pre-register you get a notice stating the meeting starts at 1:30. that just means that Zoom will be available starting at 1:30, the Pre-bid Conference will start at 2:00 p.m. Thank you. The scope of work includes, but is not limited to: o Installation of infrastructure necessary for the operation of a VOD implementation in Lane 1 of WB I-80 o Installation of two new owner-furnished Caltrans standard poles/mast arms, and furnish and installation of two corresponding pole foundations, approximately 60-ft apart o Furnish and installation of one side arm post o Furnish and installation of new conduit, pull boxes, and conductors/cables for power and communications to the VOD system equipment o Furnish and installation of a new ground-mounted unmetered electrical service pedestal o Furnish and installation of new fiber optic cable, termination panels, and fiber terminations.

Bid Results

Roads / Highways

$293,400.00

Public - State/Provincial

Site Work

Subscribe For Documents

34 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
489
Active Projects
201
Bidding Soon
2,890
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 4, 2021

April 5, 2021

Project location map

Route 80 At the Toll Plaza, San Francisco, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.