BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work, remodeling and renovation of a water / sewer project in San Francisco, California. Completed plans call for the remodel of a water / sewer project.

**As of February 9, 2024 this project has not yet been awarded. A timeline for award has not yet been established.** **As of December 11, 2023, this project has not yet been awarded. A timeline for award has not yet been established.** The Project work consists of: furnish and install a complete working Methane Gas Detection System in the Airport Central Utility Tunnel. This is an extension of an existing system that will go into the Terminal 1C Basement area. This project will also replace existing tunnel ventilation fans and provide new gas shutoff valves at the Airport's gas main meter assembly. ADD Alternate 1 scope: 1. Provide fans with explosion proof motor. 2. Tie-in and integrate the HVAC system controls to the SFO network for remote access, monitoring and future integration with iconics for data storage and analysis. 3. Provide testing and commissioning for all fans. TRADES REQUESTED: DEMO | HVAC | ELECTRICAL | PLUMBING | MECHANICAL Question Submission Deadline: October 20, 2023, 5:00pm For all questions on the Bid Documents, contact the Contract Administrator: Brian Davidson San Francisco International Airport 650-821-7718 brian.davidson.hil@sfoconsultant.com The purpose of this project is to select a qualified contractor to furnish and install a complete working Methane Gas Detection System in the Airport Utility Tunnel. This is an extension of an existing system that will go into the Terminal 1 Basement area. This project will also replace existing tunnel ventilation fans and provide new gas shutoff valves at the Airport's gas main meter assembly 11.1% MBE; 1.8% WBE; 0% OBE

Bid Results

Water / Sewer

$3,182,663.00

Public - City

Remodeling, Renovation, Site Work

63

13

40

3

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
156
Active Projects
80
Bidding Soon
1,747
All Active Projects
737
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 14, 2023

January 1, 2024

img_map_placeholder

780 N McDonnell Rd, San Francisco, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.