EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 23, 2021 at 8:00 PM

Updated September 14, 2023

Site work and paving for a civil project in Lawrence, Kansas. Completed plans call for site work for a bridge / tunnel; road / highway; and for paving for a road / highway.

As of March 4 2021 project was not yet been awarded. No estimated time frame yet. Douglas County Projects 2017-56 & 2017-60 consists of Removal of Existing Structures, Grading, Cross Road Pipes, CIP Concrete Traversable Headwalls, Precast RCB (Installation Only), Precast RCF (Installation Only), Entrance Pipes, Entrances, Aggregate Base (AB-3), HMA-Commercial Grade (Class A) Asphalt, Rip Rap, Aggregate Surfacing (AB-3), Temporary Erosion Control, Erosion Control Mat, Temporary and Permanent Seeding, and Traffic Control. Douglas County Projects 2017-56 & 2017-60 are located on Douglas County Route 1061 approximately 2 miles south of Eudora, KS. Direct questions concerning this bid to Teresa Crosetto at tcrosetto@douglascountyks.org. Contract Documents will be shipped only if the requesting party assumes responsibility for all related shipping charges. Corporate, certified, or cashier's checks shall be made payable to Drexel Technologies.

Award

Bridges / Tunnels

$746,961.00

Public - County

Paving, Site Work

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Subsurface Investigation, Material Testing
Division 04 - Masonry

Division 04 - Masonry

Masonry, Common Work Results for Masonry
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment, Parking Key and Card Control Units
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Grading, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Planting
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Conveyors, Batching Equipment, Mixers, Material Storage

Find More Local Projects

Within 75 Miles of This Project
61
Active Projects
37
Bidding Soon
645
All Active Projects
239
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 2, 2021

April 12, 2021

img_map_placeholder

Multiple Locations, Lawrence, KS


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.