BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 17, 2021 at 8:00 PM

Updated September 9, 2025

Site work for a water / sewer project in Walden, Colorado. Completed plans call for site work for a water / sewer project.

As of 3/16/2021 project was not yet been awarded. No estimated time frame yet. Written Questions Due 2/26/2021 14:00 Answers posted on Colorado VSS 3/2/2021 17:00 The Project is located in Jackson County, Colorado. Flowlines and Tank Batteries were operated by CM Production LLC (COGCC Operator Number 10352), decommissioning production equipment at 3 sites ("Project Locations"), abandonment of related flowlines, and debris removal. MARGARET SPAULDING "Tank Battery" Location Number ID 324634. Formerly operated byCM Production LLC, COGCC operator number 10352. Located approximately 12 mile west of Walden in Jackson County, CO. Remove all production equipment from location. Fifteen 400 BBLS above ground storage tanks, Five separators, Seven empty 330 gallonstotes, Ten outbuildings of varioussizesfrom 64 sf to 660 sf above ground flowlines and 3050 feet of below grade on location flowline. Remove all flowlines to the edge of location and cut, cap, and bury per COGCC Guidelines or as approved by COGCC. Remove all trash and debris from location. NOFFSINGER (OWP) #1-C Location Number ID 324605. Formerly operated by CM Production LLC, COGCC operator number 10352. Located approximately 12 mile west of Walden in Jackson County, CO. Remove all production equipment from location. Two 400 Produced water tanks, one vertical separator and one pump house. Remove all below grade flowlines to the edge of location and cut, cap, and bury per COGCC Guidelines or as approved by COGCC. Approximately 450 feet of on location below grade flowlines. Remove all trash and debris from location. CM Production Field is made up of 21 wells within 2 square miles. Located approximately 12 miles west of Walden in Jackson County, CO. Remove all below grade flowlines to the edge of location and cut, cap, and bury per COGCC Guidelines or as approved by GCC.. Approximately 4400 feet of on location below grade flowlines. Remove all equipment and debris, such as pump jacks with pump jack bases, trash, scrap steel and buildings. The following is specifically excluded from this Scope of Work: 1. Submission of COGCC forms. The Project Manager or other COGCC staff will prepare and submit all COGCC forms needed for the work. 2. Global Positioning System well location data and flowline riser endpoint data will be measured by COGCC staff or others. The Contractor will not be responsible for obtaining this data. 3. Work includes management of de minimis oil and gas exploration and production (E&P) waste only to the extent necessary to perform work related to plugging the Wells, abandoning flowlines, and decommissioning production equipment, as described in the Bid Documents. E&P Waste, as defined in COGCC's 100-Series Rules is exempt from regulation as hazardous waste under Subtitle C of the Resource Conservation and Recovery Act (RCRA), 42 USC Sections 6921, et seq. COGCC will provide E&P Waste Manifests to the Contractor. If the Contractor discovers existing, historic contamination from former oil and gas operations at the Locations during execution of the work, Contractor shall immediately notify the Project Manager. Removal or remediation of existing, historic contamination beyond the work areas required by the Contractor to execute the Scope of Work in this solicitation is not included in the Scope of Work for this project. 4. Surface reclamation of the Project Locations will be performed by others under a separate contract.

Award

Water / Sewer

$277,845.00

Public - State/Provincial

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 10, 2021

April 8, 2021

Project location map

Multiple Locations, Walden, CO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.