Published April 15, 2021 at 8:00 PM

Updated March 17, 2026

Site work and paving for a road / highway in Buckeye, Arizona. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Last Day for Questions: March 26, 2021 no later than 5:00 pm local time Project Scope of Work includes new roadway, concrete curb/gutter/sidewalk/ramps, drainage facilities, removals, signing/marking, traffic signal and storm drain facility installations. The construction consists of intersection widening and the installation of a traffic signal at the Intersection of Miller Road/Southern Avenue in addition to paving and drainage improvements to Miller Road and Southern Avenue, more particularly defined in Sections 500 and 600, Special Provisions and Construction Plans attached hereto. The Bidder is required to email and then submit through mail a certified or cashier's check, upon a solvent bank, or a surety bond in an amount equal to ten percent (10%) of the Base Bid made payable to the City of Buckeye. The bid security shall be given as a guarantee that the Bidder will enter into the Contract if awarded to him; and shall be declared forfeited as liquidated damages if he refuses to enter into said contract upon request to do so by the City. The Bid security other than bid bonds will be returned to the unsuccessful bidders and to the successful bidder upon his execution of a satisfactory payment and performance bond, and contract. Failure by the Bidder to submit bid security will result in rejection of the Bid as nonresponsive. If a surety bond is used as bid security it shall be executed on the form provided in Attachment 1 of the bid package. The surety bond provided as bid security shall be executed solely by a surety company or companies holding a certificate of authority to transact surety business in this state issued by the Director of the Department of Insurance pursuant to Title 20, Chapter 2, Article 1. The surety bond shall not be executed by an individual surety or sureties. All bids must also include a list of sub-contractors being proposed for this project. A Subcontractor List is attached hereto as Attachment 2. The Contractor to whom the Contract is awarded shall, after being awarded the Contract, furnish to the City with a fully executed Contract a satisfactory performance and payment bond in an amount equal to one hundred percent (100%) of the full amount of the Bid, such bond not to be expressly limited as to time in which action may be instituted against the surety company for possible nonperformance of the Contractor. Work shall commence immediately after the issuance of the Notice to Proceed and shall be completed within One Hundred Eighty (180) calendar days from the date established by such Notice. Subject to the provisions of the City's Procurement Code, the City reserves the right to reject any or all Bids, to waive or decline to waive irregularities in any bid, or to withhold the award if the City determines it to be in the best interests of the Cit

Award

Roads / Highways

$2,167,934.00

Public - State/Provincial

Paving, Site Work

54

1

4

7

Subscribe For Documents

44 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
28
Active Projects
2
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 6, 2021

June 7, 2021

Project location map

N Miller Rd, Buckeye, AZ

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.