BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 1, 2023 at 8:00 PM

Updated October 9, 2024

Demolition, site work, paving and new construction of a bridge / tunnel in Palmer, Massachusetts. Completed plans call for the construction of a bridge / tunnel; for paving for a bridge / tunnel; for the demolition of a bridge / tunnel; and for site work for a bridge / tunnel.

Andrea says project is not awarded yet. Church Street Bridge Replacement Project - Removal and Demolition of existing bridge and modifications to existing abutments to accept new prefabricated modular truss bridge. All questions about the meaning or intent of the Bidding Documents shall be submitted in writing to the Engineer via the Tighe & Bond website for bidding document distribution at:

Bid Results

Bridges / Tunnels

$2,310,860.00

Public - City

Demolition, New Construction, Paving, Site Work

21

10

5

Subscribe For Documents

46 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
717
Active Projects
301
Bidding Soon
5,253
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 30, 2023

May 29, 2023

Project location map

Church St, Palmer, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.