BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, renovation and addition to an educational facility in Milk River, Alberta. Conceptual plans call for the renovation of a educational facility; and for the addition of a 22,302-square-foot, one-story above grade educational facility.

https://calgary.ctvnews.ca/contractors-want-to-repurpose-milk-river-high-school-rather-than-see-it-demolished-1.6871576 LETHBRIDGE - The bell at Erle Rivers High School in Milk River, Alta., will ring for the last time on June 26, as the 114-year-old school is scheduled to be torn down to make way for a new K-12 school. But a group of contractors hopes to preserve the building and convert it into a multi-use centre, including adding 23 one- and two-bedroom units, expanding a church and adding community spaces. "Much of this well-maintained building is pre-cast concrete and designed to last for generations," said Jarrad McCoy, a Milk River-based contractor. "It has a fresh roof that should last another 40-plus years, handicap accessibility, high-quality doors and windows. ... This would be ideal for young families and professionals to call home." In a town short of rental units, retired Milk River doctor Lisa Lewke-Bogle says the project would fill a number of gaps in the community. "This project would be a godsend," she said. "Everybody wants to sell and nobody wants to rent and people coming into the community aren't always ready to commit to purchasing property." Both Lewke-Bogle and McCoy say more housing options would also help grow the town and attract outside investors. In order to stay on track with its timeline and pre-existing contract, Horizon School Division, which operates Erle Rivers, says the building is set to be demolished. The Alberta government is planning to build a $24.7-million K-12 school on a new piece of property in the town. The demolition of the existing school has a price tag of $850,000. In August, the group met with town council about the proposed plan. The group says council was on board. After the meeting, the group met with Horizon, who the group says ultimately decided on continuing with the demolition despite an investor's offer of $250,000 to save the school. "The board has decided to proceed with demolition given the deteriorating condition of the building, the pre-existing signed contract between the board, Alberta Infrastructure and the general contractor, the need to adhere to pre-existing timelines and the significant costs and risk to the board regarding possible salvage at this point in time," a statement Horizon board chair Marie Logan said. But supporters say they haven't been able to get a clear answer as to why the board won't consider the plan. "When you're in a position of leadership, one of your key responsibilities is to listen," said Bob Bogle, a former MLA for Milk River. "You need to sit down with the people you've been elected to represent and listen to them and you can't listen if you don't meet. "All those potential investors and developers are asking for is an opportunity to sit down, meet and be heard." Horizon went on to say the board intends to dispose of the bare land to the town following the demolition process, so the town can make decisions regarding future development. Which McCoy says then has the potential to be turned into residential properties. It's a step he's calling unnecessary. "New construction of this quality of institution-grade building starts around $300 a square foot," he said. "Even new residential construction is around $200 a square foot, if you're lucky. To retrofit some of these units would be half of that ... about $100 a square foot." Alberta Education Minister Demetrios Nicolaides says the province takes the directions set by the school boards on how best to use schools. "They are in the best position to decide how to manage their budget, save costs and operate their facilities," a statement from his office said. The group hopes to meet with the town and school division again before the building is torn down. ------------------------------------------------------------------------------------------------------------- Work of this Contract comprises the following: Solution for the Milk River and Erie Rivers Schools. .1 Construction, addition, and modernization of Milk River Elementary School in accordance with the Contract Documents. .2 Demolition of existing Erle Rivers High School, in accordance with the Contract Documents. .2 Milk River Elementary School Municipal Address: 505 4 Avenue NE, Milk River AB T8A 3K3 .3 Erle Rivers High School Municipal Address: 205 3 Avenue NE, Milk River AB T0K 1M0 For the Milk River K-12 School, the Contractor shall attain Interim Acceptance of the Work by the 2nd day of July in the year 2024. For the Erle Rivers School, the Contractor shall attain Interim Acceptance of the Work by the 29th day of December in the year 2024. Bid values are undisclosed. Project has been cancelled - Plans to retender has not been determined.

Project Abandoned

Educational

$14,000,000.00

Public - State/Provincial

Addition, Demolition, LEED Certification, Renovation

393

46

28

2

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
3
Active Projects
2
Bidding Soon
52
All Active Projects
12
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 17, 2022

May 7, 2024

img_map_placeholder

Multiple Locations, Milk River, AB

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.