Site work and paving for a transportation facility in Gregory, South Dakota. Completed plans call for site work for a transportation facility; and for paving for a transportation facility.
**As of April 22, 2021. the project has been awarded with the amount of $2,274,842.50.** Runway 13/31 Reconstruction, Gregory Municipal Airport, Gregory, South Dakota. Base Bid Primary Work: 31,342 CuYd Unclassified Excavation, 8,448 CuYd Disposal of Excess Material, 9,683 CuYd Subbase Course (Furnished), 7,688 CuYd Subbase Course (Recycled), 4,618 CuYd Aggregate Base Course, 6,750.0 Ton Asphalt Base/Surface Course, 475.0 Ton Asphalt Binder (PG 64- 34), 37.0 Ton Emulsified Prime Coat, 12.0 Ton Emulsified Tack Coat, Lump Sum Runway & Taxiway Painting, 346 Ft 18" RCP, 1 18" RCP Flared End, 723 Ft of 4" Perforated Underdrain Piping, 12.0 Acres Seeding and Fertilizing, 6,203 CuYd of Topsoiling, 5,800 SqYd Mulching, 25,696 SqYd Full Depth Reclamation (10" Nominal Depth), 32,076 Geotextile Separator Fabric, 780 Ft Trenching and Backfill for Conduit, 944 Ft Type C Cable Installed in Conduit, 673 Ft Counterpoise Wire, 25 Medium Intensity Taxiway Lights, 2 Reflectorized Holding Position Signs, Combination of Raise/Lower Stake and Base Mounted Runway/ Taxiway Lights, and other items of miscellaneous construction. Plans and Specifications may be retrieved by registering with the Issuing Office at through electronically. Following registration, complete sets of Plans and Specifications may be downloaded as portable document format (PDF) files. Users who have downloaded the Plans and Specifications will be mailed an invoice of $20.00. All payments are non-refundable. Additionally, upon request, in accordance with South Dakota Codified Law 5-18B-1, one copy of Plans and Specifications shall be furnished, without charge, to each Contractor resident in South Dakota who intends, in good faith, to bid upon the project. Bid Guarantee: Each bid must be accompanied by a certified check, cashier's check or draft in the amount of five percent (5%) of the total bid, and drawn on a solvent State or National Bank, or a ten percent (10%) Bid Bond issued by a surety authorized to do business in the State of South Dakota and payable to the City of Gregory, South Dakota. Contract Bonds: Separate Payment and Performance Bonds guaranteeing faithful performance of the Contract and payment of all labor, materials, rentals, etc., will be required for an amount equal to one hundred percent (100%) of the amount of the Contract. All bonds must be issued or co-signed by a licensed resident agent of South Dakota. Commencement and Completion: The Engineer will set the beginning date in a written "Notice to Proceed with Construction". The Contractor shall begin the work within ten (10) days of the date set forth in the written "Notice to Proceed" and shall complete the work within the number of calendar days, working days, or completion date or dates as shown in the Specifications. Title VI: The City of Gregory, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252, 42 USC 2000d to 2000d-4) and the Regulations, hereby notifies all bidders or offerors that it will affirmatively ensure that any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full and fair opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award. Minimum Wage Rates: The successful bidder will be required to comply with all applicable Federal Labor Laws, including the minimum wage rates decision of the United States Department of Labor. Affirmative Action: A Contractor who may be awarded a contract of $10,000 or more and subcontractors who may be awarded a subcontract of $10,000 or more will be required to maintain an affirmative action program, the standards for which are contained in the advertised specifications. Award of Contract: The right is reserved, as the interest of the City of Gregory, South Dakota, may require, to reject any and all bids, to waive informality in bids received, and to accept or reject any items of any bid, unless such bid is qualified by specific limitation. The contractor will certify that he and any of his subcontractors meet the requirements of 49 CFR, Part 29, regarding debarment, suspension, ineligibility and voluntary exclusion as further described in these specifications. The contractor will certify that he and his subcontractors will comply with the 49 CFR, 30.17, regarding Foreign Trade Restrictions as further noted in project specifications. The contractor will certify that he and his subcontractors will comply with "Buy American Certification (JAN. 1991)" as further noted in project specifications. The contractor will comply with "Buy American-steel and Manufactured Products for Construction Contracts (JAN. 1991) as further described in project specifications. If an applicant (corporation) has either unpaid Federal tax liability or has been convicted of a criminal violation under any Federal law within the preceding 24 months, the applicant is ineligible to receive an award unless the sponsor has received notification from the agency suspension and debarment official (SDO) that the SDO has considered suspension or debarment and determined that further action is not required to protect the Government's interests. Goals for minority participation for each trade: 0.8% Goals for female participation in each trade: 6.9%
Award
Transportation Terminals
$2,274,843.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 15, 2021
May 17, 2021
120 W 6th St, Gregory, SD
Related To This Project
Gregory, SD
Bid Date: Apr 10 2024
Gregory, SD
Bid Date: Jun 15 2023
Gregory, SD
--
Gregory, SD
--
Gregory, SD
Bid Date: May 05 2022
Gregory, SD
Bid Date: Mar 29 2022
Gregory, SD
Bid Date: Nov 17 2021
Gregory, SD
Bid Date: Nov 11 2022
Hayti, SD
Bid Date: May 17 2021
Pukwana, SD
Bid Date: Apr 29 2021
Custer, SD
Bid Date: Apr 22 2021
Hayti, SD
Bid Date: Sep 15 2021
Bristol, SD
Bid Date: Jun 03 2021
Watertown, SD
Bid Date: Jun 29 2021
Arlington, SD
Bid Date: Jul 15 2021
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.