BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 12, 2021 at 8:00 PM

Updated September 15, 2023

Site work for a civil project in Saddle Hills County, Alberta. Completed plans call for site work for a bridge / tunnel; and road / highway.

Work shall include the supply and installation of a new bridge culvert over a Tributary to Saddle Burnt River, located 6 km southwest of Woking (SW 11-76-6-W6M). The Contractor shall install a 4.3 m diameter SPCSP culvert by 59.74 m invert length as per the Drawings and Section 18 of the Standard Specifications for Bridge Construction. The culvert will be located 30-degree LHF skew to the local road, centred at Station 5+548.000. The Scope of the Work includes, but is not limited to, the following: Traffic accommodation Site isolation and turbidity monitoring Fish capture and release Demolition and disposal of bridge structures Excavation, including geotextile filter fabric Supply and assembly of culvert materials Backfill, including backfill material testing Concrete end treatment, including testing and small bridge plaque Heavy rock riprap erosion protection Roadway work Permanent environmental protection devices Documents can be obtained from https://buildworkscanada.com

Bid Results

Bridges / Tunnels

$885,000.00

Public - County

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
22
Active Projects
7
Bidding Soon
97
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 3, 2021

July 2, 2021

Project location map

Tributary to Saddle Burnt River, Range Road 62, SW 11-76-6-W6M, Saddle Hills County, AB

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.