BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Miami Beach, Florida. Working plans call for site work for a road / highway; and for paving for a road / highway.

**As of 12/17/2021, the project was not awarded because it was rejected at the October commision. n 2018, the City engaged Alta Planning and Design, Inc. with sub-consultant GEHL Studio, Inc., to prepare a master plan which creates principles for design and development along the 41st Street Corridor. The master plan would prioritize people along the corridor, rather than cars, by supporting consistent, safe and comfortable bus and bike networks, creating more reasons to spend time on the street, support transit riders and foster social resiliency. In 2020, the City engaged AECOM to prepare a feasibility study for the implementation of the Alta/GEHL findings, with estimates of the probable construction costs, and develop conceptual drawings for the area which encompasses that portion of 41st Street, between Alton Road and Pine Tree Drive, and that portion of all avenues, between Alton Road and Pine Tree Drive, North to 42nd Street and South to 40th Street. On May 14,2021, the City issued an RFQ for Architectural and Engineering design services for the 41st Street Corridor Revitalization Project to provide complete design and construction documents, and related services necessary to implement the project. Through this RFQ, the City now seeks proposals from Construction Manager at Risk (CMR) firms with the capabilities and experience to provide preconstruction services and construction phase services via a Guaranteed Maximum Price (GMP) amendment for the implementation of the streetscape redesign of 41st Street, between Alton Road and Pine Tree Drive, and between 42nd Street and 40th Street. Work required under this RFQ shall be performed in accordance with the approved design and construction documents for the project, and will include, at a minimum, enhancement of the pedestrian walkways, alteration of on street parking spaces, providing bike lanes, landscape and irrigation, outdoor seating, alteration of bus shelters and providing a gateway feature at the entrance of 41st Street. The successful CMR firm must demonstrate an ability to provide multi-disciplinary management in the areas of scope definition/validation, cost estimating, construction scheduling, quality control and assurance plan, building code review/inspection, design and constructability review, close out, and warranty services. ANTICIPATED RFQ TIMETABLE. The tentative schedule for this solicitation is as follows: RFQ Issued June 25, 2021 Pre-Proposal Meeting July 7, 2021 @ 2:00 p.m. ET Deadline for Receipt of Questions July 21, 2021 @ 5:00 p.m. ET Responses Due August 9, 2021 @ 3:00 p.m. ET Evaluation Committee Review TBD Proposer Presentations TBD Tentative Commission Approval Authorizing Negotiations TBD Contract Negotiations Q & A deadline: Jul 21, 2021 5:00:00 PM EDT Any questions or clarifications concerning this solicitation shall be submitted to the Procurement Contact noted below: Procurement Contact: Telephone: Email: Natalia Delgado 305-673-7490 nataliadelgado@miamibeachfl.gov Additionally, the City Clerk is to be copied on all communications via e-mail at: RafaelGranado@miamibeachfl.gov ; or via facsimile: 786-394-4188.

Final Planning

Roads / Highways

$5,003,289.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
116
Active Projects
42
Bidding Soon
1,075
All Active Projects
473
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 9, 2021

June 17, 2022

img_map_placeholder

41st St, Miami Beach, FL


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.