BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Stratford, Connecticut. Completed plans call for the renovation of a educational facility.

As of 11/16/2021 project was already awarded, start date is sometime in Spring of 2022. The Town of Stratford (Town) and on behalf of its Board of Education (BOE) is seeking competitive bids from qualified contractors to perform Roof Replacement at Wooster Middle School, 150 Lincoln Street, Stratford. The roof replacement scope of work is Phase 1 of 2. Phase 2 is installation of a photovoltaic system on Phase 1 new roof. Roofing Contractor shall allow time to meet with and coordinate with Photovoltaic Contractor to accommodate and coordinate both phases of work as needed. Response will be in the form of an addendum that will be posted approximately Thursday, 21st October, 2021 at the close of business to the Purchasing Department website. Questions concerning conditions, bidding guidelines and specifications should only be directed in writing to: Mr. Phillip Ryan, Purchasing Agent: PRyan@townofstratford.com After Review of All Factors, Terms and Conditions, Including Price, the Town of Stratford Reserves the Right to Reject Any and All Bids, or Any Part Thereof, or Waive Defects in Same, Or Accept Any Proposal Deemed to Be in the Best Interest of the Town of Stratford. The BID BOND furnished, as bid security, must be duly executed by the bidder as principal. It must be in the amount equal to five percent (5%) of the total estimated bid, as guarantee that, in case the contract is awarded to the bidder, the bidder will, within ten days thereafter, execute such contract and furnish a Performance Bond and Payment Bond. Small businesses may elect to obtain an irrevocable letter of credit or cashier's check in lieu of the Bid Bond. Such surety must also be in an amount equal to at least five percent (5%) of the total estimated bid. The successful bidder, within seven (7) business days after notification of award, will be required to furnish Performance and Labor and Material Bond provided by a company authorized to issue such bonds in the State of Connecticut, or Certified Check or properly executed Irrevocable Letter of Credit equal to a hundred per cent (100%) of the award.

Award

Educational

$2,052,000.00

Public - City

Renovation

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
440
Active Projects
257
Bidding Soon
4,139
All Active Projects
1,736
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 26, 2021

March 23, 2022

img_map_placeholder

150 Lincoln St, Stratford, CT

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.