Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published December 28, 2021 at 7:00 PM
Updated November 15, 2023
Site work for a road / highway in Afton, Minnesota. Completed plans call for site work for a road / highway.
As of December 28 2021 this project was awarded and completed. The Work consists of furnishing all labor, materials, equipment, skills, and performing all operations required to construct the Work. The Work includes, but is not limited to, mobilization and demobilization; furnishing, installing, maintaining, and removing temporary erosion control facilities; clearing, grubbing, tree removal, and tree protection; soil excavation, disposal and grading; furnishing and installing storm sewer and manhole outlet structures; furnishing and installing riprap; furnishing and installing rock filter dikes; furnishing and installing permanent erosion control facilities including erosion control blanket, hydromulch, and turf reinforcement mat; furnishing and installing seeding and plantings; all as provided for in the Bidding Documents. All quantities and work items in this advertisement for bid are approximate and are not guaranteed. Neal Avenue South and Valley Creek Trail, Afton, MN A contractor responding to this solicitation document shall submit to the Owner a signed statement under oath by an owner or officer verifying compliance with each of the minimum criteria in Minnesota Statutes section 16C.285 subdivision 4.
Occupancy
Roads / Highways
$244,418.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 9, 2021
December 2, 2021
Valley Creek Trail & Neal Ave S, Afton, MN
Related To This Project
Afton, MN
Bid Date: May 14 2024
Afton, MN
--
Afton, MN
Bid Date: Sep 27 2024
Afton, MN
Bid Date: May 05 2025
Afton, MN
Bid Date: May 05 2025
Afton, MN
Bid Date: May 27 2025
Afton, MN
Bid Date: Jul 18 2025
Afton, MN
--
Afton, MN
Bid Date: Aug 02 2022
Afton, MN
Bid Date: Jul 12 2022
Afton, MN
Bid Date: Dec 12 2022
Afton, MN
Bid Date: Jan 07 2021
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
