Published July 1, 2025 at 8:00 PM

Updated July 19, 2025

Site work and paving for a road / highway in Afton, Minnesota. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Washington County is looking to perform a mill and overlay along CSAH 18 (Afton Blvd. S.). This Request for Quote (RFQ) has been prepared by Washington County to secure services for a 2" mill and overlay of an approximately 900' section of CSAH 18. Questions Due July 15, 2025 Notification of Award July 22, 2025 Construction Early August, 2025 Coordination with Washington County is required to establish a project start date. The project will start in early August of 2025. Once the project has begun, the contractor will have 3 days to complete the project. This Work consists of providing additional traffic control devices in accordance with (2563) Temporary Traffic Control and as authorized by the Engineer. The Engineer is authorized to: (1) Require extra traffic control devices in addition to the traffic control devices shown in the Traffic Control Plan or in the Field Manual. (2) Require additional traffic control devices for EXTRA WORK. (3) Require extended use for all traffic control devices which are impacted by excusable and compensable delays, as defined in MnDOT 1806.2B. (4) Negotiate compensation for a Lump Sum Payment. This Work consists of furnishing, installing, maintaining, and removing all traffic control devices required to provide safe movement of traffic and pedestrians through the Project at all times from commencement of the Work until Project Acceptance. Maintain roads and pedestrian facilities undergoing improvements in a condition that accommodates public traffic. Do not close roads or pedestrian facilities, except as authorized. The Engineer may modify the requirements for traffic control as deemed necessary. This Work consists of furnishing, installing, maintaining, and removing Portable Changeable Message Signs (PCMS) in accordance with (2563) TRAFFIC CONTROL. The 2020 edition of the Minnesota Department of Transportation "Standard Specifications For Construction" shall govern. All work must be completed according to the Plans (Appendix B) and Specifications (Appendix C) All work shall be done under traffic with the use of flaggers according to the specifications. A traffic control plan shall be submitted and approved by the County prior to beginning work. The work to be performed is not to exceed a specified amount. County authorized work completed outside the original scope may qualify for additional compensation. Coordination with Washington County is required to establish a project start date. The project will start in early August of 2025. Once the project has begun, the contractor will have 3 days to complete the project.

Post-Bid

Roads / Highways

$1,000,000.00

Public - County

Paving, Site Work

6

11

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
256
Active Projects
141
Bidding Soon
1,450
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 18, 2025

August 1, 2025

Project location map

Afton Blvd S, Afton, MN

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.