Site work and paving for a road / highway in Afton, Minnesota. Completed plans call for site work for a road / highway; and for paving for a road / highway.
Washington County is looking to perform a mill and overlay along CSAH 18 (Afton Blvd. S.). This Request for Quote (RFQ) has been prepared by Washington County to secure services for a 2" mill and overlay of an approximately 900' section of CSAH 18. Questions Due July 15, 2025 Notification of Award July 22, 2025 Construction Early August, 2025 Coordination with Washington County is required to establish a project start date. The project will start in early August of 2025. Once the project has begun, the contractor will have 3 days to complete the project. This Work consists of providing additional traffic control devices in accordance with (2563) Temporary Traffic Control and as authorized by the Engineer. The Engineer is authorized to: (1) Require extra traffic control devices in addition to the traffic control devices shown in the Traffic Control Plan or in the Field Manual. (2) Require additional traffic control devices for EXTRA WORK. (3) Require extended use for all traffic control devices which are impacted by excusable and compensable delays, as defined in MnDOT 1806.2B. (4) Negotiate compensation for a Lump Sum Payment. This Work consists of furnishing, installing, maintaining, and removing all traffic control devices required to provide safe movement of traffic and pedestrians through the Project at all times from commencement of the Work until Project Acceptance. Maintain roads and pedestrian facilities undergoing improvements in a condition that accommodates public traffic. Do not close roads or pedestrian facilities, except as authorized. The Engineer may modify the requirements for traffic control as deemed necessary. This Work consists of furnishing, installing, maintaining, and removing Portable Changeable Message Signs (PCMS) in accordance with (2563) TRAFFIC CONTROL. The 2020 edition of the Minnesota Department of Transportation "Standard Specifications For Construction" shall govern. All work must be completed according to the Plans (Appendix B) and Specifications (Appendix C) All work shall be done under traffic with the use of flaggers according to the specifications. A traffic control plan shall be submitted and approved by the County prior to beginning work. The work to be performed is not to exceed a specified amount. County authorized work completed outside the original scope may qualify for additional compensation. Coordination with Washington County is required to establish a project start date. The project will start in early August of 2025. Once the project has begun, the contractor will have 3 days to complete the project.
Post-Bid
Roads / Highways
$1,000,000.00
Public - County
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 18, 2025
August 1, 2025
Afton Blvd S, Afton, MN
Related To This Project
Afton, MN
Bid Date: May 27 2025
Afton, MN
Bid Date: May 05 2025
Afton, MN
Bid Date: May 05 2025
Afton, MN
Bid Date: Sep 27 2024
Afton, MN
--
Afton, MN
Bid Date: May 14 2024
Afton, MN
Bid Date: Jul 09 2021
Afton, MN
--
Afton, MN
Bid Date: Aug 02 2022
Afton, MN
Bid Date: Jul 12 2022
Afton, MN
Bid Date: Dec 12 2022
Afton, MN
Bid Date: Jan 07 2021
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.