Demolition, site work, paving and new construction of a civil project in Reading, Pennsylvania. Completed plans call for site work for a road / highway; for paving for a road / highway; for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; bridge / tunnel; and bridge / tunnel.

As of January 18, 2024, the project has been awarded, however, a timeline for construction has not been established. The Sr 0061, Section 16m/10b Project in the Borough of Hamburg and Tilden Township Will Restore the Roadway and Upgrade the Guide Rail and Median Barrier Along the Corridor. The Project Includes One (1) Structure Replacement, and Three (3) Structure Rehabilitations. The Rehabilitations Involve Work Over Both Waterways and the Rbmn Rr Including the 874-long Structure Carrying Sr 0061 Over the Schuylkill River, Rbmn Rr and Sr 4028 and Other Miscellaneous Construction, as Indicated on the Approved Drawings Included in the Bid Package for State Route 0061, Section 16m, in Berks County Hamburg Borough and Tilden Township From Approximately the Intersection With Sr 4035 at Segment 0340/0341 Offset 0405/0289 to Approximately Interstate 78 at Segment 0374/0375 Offset 0564/0565. Project Cost Range: $20,000,000.00 - $24,999,999.99 Federal Project Status: PENNDOT Oversight NHS Structure Work: 52.00% Pre-bid Meeting: None Wage Rates: Yes Prequalification Requirement: Yes State Type of Work: Highway Reconstruction Responses to questions on this page are for informational and clarification purposes. Official changes to the proposal will be made via an Addendum. The deadline for submitting questions is 72 hours before the let date and time. For Emergency projects, the deadline is reduced to 19 hours before the let date and time. PennDOT - PA 61 Restoration Phase 2A *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. *This project has been awarded and all trades have been let.

Award

Bridges / Tunnels

$30,301,076.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

602

13

15

5

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Temporary Access Roads, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Facility Remediation, Transportation and Disposal of Hazardous Materials, Asbestos Remediation
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel, Welded Wire Fabric Reinforcing, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies, Corrosion-Resistant Masonry, Vitrified Clay Liner Plate
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing, Underlayment
Division 08 - Openings

Division 08 - Openings

Hardware, Glazing, Louvers and Vents
Division 09 - Finishes

Division 09 - Finishes

Flooring, Carpeting, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Toilet, Bath, and Laundry Accessories
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Loading Dock Equipment, Educational and Scientific Equipment, Laboratory Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Furniture, Residential Furniture, Beds
Division 13 - Special Construction

Division 13 - Special Construction

Special Structures, Fabricated Engineered Structures, Integrated Construction, Radiation Protection
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution, Facility Electrical Power Generating and Storing Equipment, Battery Equipment, Batteries
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls, Earthwork Methods, Gabions, Gabion Mattresses, Shoring and Underpinning, Shoring, Sheet Piling, Excavation Support and Protection, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Site Improvements, Fences and Gates, Planting, Turf and Grasses, Seeding
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Storage Tanks, Storm Drainage Utilities, Culverts
Division 34 - Transportation

Division 34 - Transportation

Transportation, Guideways/Railways, Rail Tracks, Transportation Construction and Equipment, Roadway Construction, Impact Attenuating Devices
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Marine Construction and Equipment, Marine Specialties, Buoys
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Cranes and Hoists, Lifting Devices, Lifts
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
286
Active Projects
172
Bidding Soon
2,383
All Active Projects
1,092
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

PA 61 Restoration Phase 2A

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.