BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 26, 2023 at 8:00 PM

Updated September 27, 2023

Demolition, site work, paving and new construction of a bridge / tunnel in Santa Barbara, California. Conceptual plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

The project replaces the existing structurally deficient bridge located on Hollister Street over Tecolotito Creek, between Los Carneros Road and Cremona Drive. The project is estimated at $11.7 million for preliminary engineering, right-of-way, and construction phases. The City match requirement for this bridge is estimated to be 11.47%, which is the standard under the Highway Bridge Program (HBP). This project is currently in the City of Santa Barbara's FY 2022-2026 CIP. Per the owner, as of September 26, 2023, this project has not begun design. The owner states that construction on this project is at least ten years out. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Bridges / Tunnels

$11,700,000.00

Public - City

Demolition, New Construction, Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
26
Active Projects
0
Bidding Soon
352
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 1, 2033

Project location map

Hollister Ave, Santa Barbara, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.