BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 9, 2025 at 8:00 PM

Updated September 10, 2025

Site work and paving for a mixed-use development in Virginia Beach, Virginia. Conceptual plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Update:This project provides funding to design and construct water system improvements along Rosemont Road between Lynnhaven Parkway and Dam Neck Road. This project is coordinated with roadway project 100340 - Rosemont Road PH V. Project is included in City of Virginia Beach Fiscal Year 2026-2031 ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- Update:VDOT UPC #105623. This project is for the construcon of a four-lane divided roadway from Primrose Lane/Harbringer Road to Dam Neck Road, a distance of approximately 1.3 miles. The four-lane divided roadway will include a connuous 10-foot wide sidewalk along the east side of the corridor, as well as a 10-foot wide sidewalk along the west side from Faculty Boulevard to Lynnhaven Parkway. This project also includes the upgrade of three exisng traffic signals at Buckner Boulevard, Faculty Boulevard/Celc Drive, and Concert Drive. Project is included in City of Virginia Beach Fiscal Year 2026-2031 ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- Update:https://s3.us-east-1.amazonaws.com/virginia-beach-departments-docs/budget/Budget/Proposed/FY-2025/FY25-Proposed-CIP-Budget.pdf VDOT UPC #105623. This project is for the construcon of a four-lane divided roadway from Primrose Lane/Harbringer Road to Dam Neck Road, a distance of approximately 1.3 miles. The four-lane divided roadway will include a connuous 10-foot wide sidewalk along the east side of the corridor, as well as a 10-foot wide sidewalk along the west side from Faculty Boulevard to Lynnhaven Parkway. This project also includes the upgrade of three exisng traffic signals at Buckner Boulevard, Faculty Boulevard/Celc Drive, and Concert Drive. Project is included City of Virginia Beach Fiscal Year 2025-2030 Page no 79 ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- UPDATE : https://www.vbgov.com/government/departments/budget-office-management-services/budget-archives/Documents/fy23-budget/Capital-Improvement-Programs-2023-2028.pdf VDOT UPC #105623. This project is for the construcon of a four-lane divided roadway from Primrose Lane/Harbringer Road to Dam Neck Road, a distance of approximately 1.3 miles. The four-lane divided roadway will include a connuous 10-foot wide sidewalk along the east side of the corridor, as well as a 10-foot wide sidewalk along the west side from Faculty Boulevard to Lynnhaven Parkway. This project also includes the upgrade of three exisng traffic signals at Buckner Boulevard, Faculty Boulevard/Celc Drive, and Concert Drive. Project is included City of Virginia Beach FY 2023 - 2028 CIP Page 71. ----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- VDOT UPC #105623. This project is for the construcon of a four-lane divided roadway from Primrose Lane/Harbringer Road to Dam Neck Road, a distance of approximately 1.3 miles. The four-lane divided roadway will include a connuous 10-foot wide sidewalk along the east side of the corridor, as well as a 10-foot wide sidewalk along the west side from Faculty Boulevard to Lynnhaven Parkway. This project also includes the upgrade of three exisng traffic signals at Buckner Boulevard, Faculty Boulevard/Celc Drive, and Concert Drive. Project is included City of Virginia Beach FY 2022-2027 CIP Page 90 *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Roads / Highways

$2,111,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
107
Active Projects
48
Bidding Soon
788
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 1, 2028

Project location map

Multiple Locations, Virginia Beach, VA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.