BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and renovation of a water / sewer project in North Port, Florida. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

The City of North Port is requesting sealed bids to secure the services of an experienced, professional, licensed, and qualified Contractor capable of providing construction services in accordance with the specifications and drawings to construct the City of North Port Myakkahatchee Creek WTP Structural Rehabilitation Project Phase II repairs in its entirety. Requests for additional information or clarification regarding the specifications must be sent via email to purchasing@Cityofnorthport.com. No verbal requests will be honored. All questions and clarifications must be submitted via e-mail by August 16, 2021 The City of North Port does not discriminate on the basis of race, color, national origin, sex, age, disability, family or religious status in administration of its programs, activities or services. 1. Concrete Rehabilitation a. Repair cracked concrete by injecting epoxy into cracks for flash mixer/splitter box, clarifier no. 2, filter tank no. 1, clearwell no. 1, and chemical feed room. b. Repair spalled concrete for flash mixer/splitter box, filter tank no. 1, clearwell no. 1, and chemical feed room. c. Repair existing opening in pump room wall. d. Repair crack (CMU block) for chemical feed room. 2. Aluminum Toeboard a. Furnish and install aluminum toeboard for flash mixer/splitter box, clarifier no. 2, filter tank no. 1, and pump room no. 1. 3. Coatings a. Cementitious repair mortar for flash mixer/splitter box, filter tank no. 1, and clearwell no. 1. b. NSF 61 finish coating for walls and slab of flash mixer/splitter box, filter tank no. 1, and clearwell no. 1. 4. Filter Media a. Remove and replace filer media (anthracite coal) for filter tank no. 1. 5. Painting a. Remove and repaint interior surfaces of pump room no. 1. 6. Metal Work a. Provide new top mounted aluminum guardrail for pump room no. 1. b. Remove and replace steel bearing plate in flash mixer/splitter box. c. Remove and replace aluminum grating for flash mixer/splitter box. 7. Roof Work a. Provide new roofing system (80 mil TPO single ply roof system over tapered insulation) for pump room no. 1. b. Repair existing waterproofing system on the chemical building roof. Install liquidapplied two-component polyurethane membrane waterproofing system.

Award

Water / Sewer

$1,194,307.00

Public - City

Renovation, Site Work

18

18

9

6

Subscribe For Documents

62 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
93
Active Projects
46
Bidding Soon
815
All Active Projects
321
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 24, 2021

September 23, 2021

img_map_placeholder

4970 City Hall Blvd, North Port, FL


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.